Coordinates: 37°54′N 116°42′W / 37.900°N 116.700°W / 37.900; -116.700

Sandstone Solar Energy Project

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Sandstone Solar Energy Project
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
CountryUnited States
LocationTonopah, Nye County, Nevada
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
StatusProposed
Construction began2022 (2022) (planned)
Commission datecancelled
Construction cost$5.0 billion (estimated)
OwnersSandstone Solar Energy, LLC (SolarReserve, LLC)
Solar farm
TypeCSP
CSP technologySolar power tower
Site resource2,685 kW·h/m2/yr[1]
Site area20,000 acres (8,094 ha)
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).
Nameplate capacity1,600 MW
Capacity factor40.0% (planned)
Annual net output5,600 GW·h (planned)
Storage capacity16,000 MW·he
External links
Websitesandstone

The Sandstone Solar Energy Project was an up to 1,600 megawatt (MW) solar thermal power project with 16 gigawatt-hours of energy storage,[2] planned just to the east of Tonopah, about 170 miles (270 km) northwest of Las Vegas. The project was about up to eight 200 MW solar towers with integrated molten salt energy storage technology. The project, developed by SolarReserve and owned by Sandstone Solar Energy, LLC. was anticipated to cost about $5 billion. Planned energy output is 5,600 GW·h per year.[3]

The project includes heliostats that collect and focus the sun's thermal energy to heat molten salt flowing through a solar power tower. The molten salt circulates from the tower to a storage tank, where it is then used to produce steam and generate electricity. Excess thermal energy is stored in the molten salt and can be used to generate power for up to ten hours, including during the evening hours and when direct sunlight is not available. The storage technology also eliminates the need for any backup fossil fuels, such as natural gas.

Estimated construction start was in 2022. Each tower was constructed within a 24-month construction cycle, staggered 6 months, expecting about 5+12 years to complete.[4]

In March 2019, the U.S. Bureau of Land Management confirmed that Sandstone Solar Energy has withdrawn its application for a construction and operation right-of-way on federal land for this project.[5]

On 15 April 2019, Sandstone Solar Energy filed for withdrawal of the application for a permit to construct the solar plant and requested closure of the relevant docket (No.17-08003). The Commission acknowledged the filing and closed the docket the same day. [4]

See also

[edit | edit source]
Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').

Notes

[edit | edit source]
  1. ^ Crescent Dunes Solar Energy Project, National Renewable Energy Laboratory
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
[edit | edit source]
  • Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).