Coordinates: 40°51′38″N 105°00′38″W / 40.86056°N 105.01056°W / 40.86056; -105.01056

Bison Solar Plant

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Bison Solar Plant
File:Bison Solar Layout.jpg
The general layout of the facility
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
CountryUnited States
LocationLarimer County, Colorado
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
StatusOperational
Construction beganFebruary 2016
Commission dateOctober 2016
Construction costUS$54 million
OwnerPSEG Solar Source
Operatorsjuwi O&M Group
Solar farm
TypeFlat-panel PV
Site area190 acres (77 ha)
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).
Nameplate capacity36.3 MWp, 30 MWAC
Capacity factor23.4% (average 2017-2019)
Annual net output61.6 GW·h, 324 MW·h/acre

The Bison Solar Plant, also known as the Rawhide Flats Solar Plant, is a 30 megawatt (MWAC) photovoltaic power station in Larimer County, Colorado located about 10 miles (16 km) north of the town of Wellington. The plant is notable for being one of the first in the U.S. built to a 1500 Volt system specification.[1][2] The electricity is being sold to the Platte River Power Authority (PRPA) under a 25-year power purchase agreement.[3][4]

Facility details

[edit | edit source]

The plant occupies about 190 acres (77 ha) distributed adjacent to PRPA's natural gas and coal-fired Rawhide Energy Station.[4] It uses 117,120 polycrystalline silicon panels (Model SN-72cell: rated ~310 Wp, ~16% efficiency, 1500 Vdc isolation) that the manufacturer, S-Energy, claims are less susceptible to potential-induced degradation.[1][5][6] The panels are mounted in rows onto single-axis trackers. The rows are organized into 12 blocks, and the electricity produced from each block is connected to the electric grid through a Samurai Series 1500 Vdc, 2700 kW / 2700 kVA inverter built by TMEIC.[2] The boost in system voltage from the previous 1.0 kV standard to 1.5 kV enables the inverter to operate at higher efficiency and reliability, and is expected to reduce overall balance of system costs over the lifetime of the facility.[7]

The project was developed, constructed, and continues to be operated by Boulder-based juwi Inc., the U.S. subsidiary of the German renewable energy company juwi AG.[6] Construction began in February 2016, and commercial operation began in October 2016. The project was financed and is owned by PSEG Solar Source, a subsidiary of New Jersey's Public Service Enterprise Group. The completed facility cost about US$54 million.[4]

On February 14, 2019 PRPA announced that it entered an agreement to add another 20 MW of solar photovoltaic generating capacity at the site, anticipated to be online in early 2020. The addition will include 2 MW of lithium-ion battery storage.[8][9]

Electricity production

[edit | edit source]
Generation (MW·h) of Bison Solar [10]
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2016 5,290 3,506 2,509 11,305
2017 2,377 3,703 5,180 5,718 6,741 7,306 6,337 5,303 4,442 5,260 3,356 3,445 59,168
2018 3,339 3,926 5,077 6,153 7,090 7,620 6,641 6,631 6,373 4,752 3,917 2,836 64,356
2019 3,187 3,358 5,002 5,880 6,270 7,052 6,675 6,795 5,609 5,514 3,427 2,498 61,276
Average Annual Production (years 2017-2019) ---> 61,600

See also

[edit | edit source]
Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').

References

[edit | edit source]
  1. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  7. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  8. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  9. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  10. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).