Stateline Solar
| Stateline Solar | |
|---|---|
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| Country | United States |
| Location | San Bernardino County |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Status | Operational |
| Commission date | September 2016 |
| Owners | Southern Company and First Solar |
| Operator | First Solar |
| Solar farm | |
| Type | Flat-panel PV fixed tilt |
| Site area | 1,685 acres (682 ha) |
| Power generation | |
| Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value). | |
| Nameplate capacity | 300 MWp, ~250 MWAC |
| Capacity factor | 30.0% (average 2017-2019) |
| Annual net output | 656 GW·h, 390 MW·h/acre |
Desert Stateline Solar Facility is a 300 MWp (about 250 MWAC) utility-scale[1] solar photovoltaic power station constructed by First Solar in San Bernardino County in California, USA. It is located at the base of Clark Mountain in California, across the state line from Primm, Nevada, and adjacent to the Ivanpah Solar Power Facility.
The project uses approximately 3.2 million panels from First Solar, an amount similar to the 250 MWAC Moapa Southern Paiute Solar Project.[2]
The plant's first 150 megawatts (MW) came online in late 2015,[3][4] and it entered full commercial operation in the third quarter of 2016.[5] In September 2015, it was announced that Southern Company had purchased a controlling interest in the project.[6] First Solar continues to operate the facility. Power is sold to Southern California Edison under a 20-year power purchase agreement.[5]
Electricity production
[edit | edit source]| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2015 | 10,000 | 10,000 | |||||||||||
| 2016 | 17,099 | 27,608 | 39,592 | 43,113 | 51,623 | 53,072 | 60,006 | 60,235 | 59,467 | 54,253 | 47,456 | 34,280 | 547,804 |
| 2017 | 26,089 | 29,141 | 54,474 | 58,124 | 74,122 | 80,287 | 73,112 | 67,639 | 63,029 | 58,068 | 35,893 | 37,764 | 657,742 |
| 2018 | 30,981 | 43,611 | 49,866 | 62,339 | 75,142 | 80,961 | 69,980 | 70,467 | 66,707 | 52,557 | 36,151 | 28,760 | 667,522 |
| 2019 | 29,646 | 34,592 | 52,546 | 61,114 | 63,630 | 76,924 | 75,915 | 74,349 | 60,802 | 55,867 | 35,729 | 23,029 | 644,143 |
| Average Annual Production (years 2017–2019) ---> | 656,469 | ||||||||||||
See also
[edit | edit source]Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Desert Stateline Solar Facility Fact Sheet, Southern Power Company
- ^ EIA US Energy Mapping System
- ^ EIA Electricity Data Browser - Stateline Solar
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
External links
[edit | edit source]- Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).