| Status | Operational |
| Construction began | May 2012 |
| Commission date | Phase 1: December 2012, phase 2: August 2013 |
| Owner | enXco |
| Operator | enXco |
| Solar farm | |
| Type | Flat-panel PV |
| Site area | 445 ha (1,100 acres)[1] |
| Power generation | |
| Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value). | |
| Nameplate capacity | 143.2 MW |
The Catalina Solar Project is a 143.2 megawatt (MW) photovoltaic power station[1] located near Bakersfield, Kern County, California, owned by enXco, an EDF Énergies Nouvelles Company. It covers an area of 445 hectares (1,100 acres).
Construction began in May, 2012 and was fully completed in August, 2013.[2] It uses thin-film PV panels bought from Solar Frontier (CIGS type) and First Solar (CdTe type).[1]
Phase 1 had a nameplate capacity of 60 MW and was connected to the grid in December, 2012.
enXco has signed a 25-year Power Purchase Agreement (PPA) with San Diego Gas & Electric (SDG&E) for the production from the station.[2]
That clean electricity could offset roughly 74,000 tons of carbon emissions each year.[1]
Production
[edit | edit source]| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2012 | 200 | 200 | |||||||||||
| 2013 | 5,182 | 12,279 | 15,964 | 0 | 11,317 | 20,616 | 23,709 | 27,338 | 25,989 | 24,506 | 18,629 | 18,707 | 204,236 |
| 2014 | 18,991 | 19,563 | 24,927 | 27,237 | 28,264 | 28,924 | 27,446 | 27,679 | 25,766 | 24,371 | 20,038 | 14,777 | 287,983 |
| 2015 | 17,866 | 20,056 | 23,790 | 26,494 | 27,691 | 25,859 | 26,974 | 27,257 | 25,021 | 21,394 | 19,686 | 17,805 | 279,893 |
| 2016 | 14,873 | 21,747 | 23,337 | 20,187 | 26,765 | 27,173 | 28,073 | 26,978 | 24,757 | 21,016 | 18,962 | 15,500 | 269,368 |
| Total | 1,041,680 | ||||||||||||
See also
[edit | edit source]Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
References
[edit | edit source]- ^ a b c d "Catalina Solar Project - Project Profile" Archived 2014-12-09 at the Wayback Machine (PDF). EDF Renewable Energy. August 2012. Retrieved November 6, 2013.
- ^ a b "Project Detail - Catalina Solar Project" Archived 2013-01-02 at archive.today. EDF Renewable Energy. 2013. Retrieved November 6, 2013.
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).