Solar River Project
| Solar River Project | |
|---|---|
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| Country | Australia |
| Location | north of Robertstown, South Australia |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Status | Proposed |
| Construction began | 2027 |
| Construction cost | A$540 million |
| Solar farm | |
| Type | Flat-panel PV |
| Collectors | 628,000 (stage 1) |
| Site area | 5,000 hectares (12,000 acres) |
| Power generation | |
| Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value). | |
| Nameplate capacity | 210 MW |
| Storage capacity | 750 MW·h |
Solar River Project is a proposed photovoltaic power station planned to be built near Robertstown in South Australia.[1] As of 2025[update], plans are for 210 MW solar, and a 256 MW battery.[2]
History
[edit | edit source]The project received development approval from the Government of South Australia in June 2018 and was expected to start construction early in 2019.[3] However, as of November 2021[update], the project was still proposed to be constructed, but work on site was not expected until at least the second half of 2022.[4]
The company developing it is based at the University of Adelaide's venture incubator, ThincLab.[5] The project has the support of the Ngadjuri people and the Regional Council of Goyder.[citation needed]
Stage 1 includes 200 MW of solar photovoltaic electricity generation and a 120 MW·h lithium ion battery system and was proposed to start construction early in 2019, generating its first generation before the end of the same year. Stage 1 will consist of one hundred single-axis tracker arrays each generating 2 MW and approximately 310 by 180 metres (1,020 by 590 ft)[6] for a total area of 3,200 by 1,800 metres (10,500 by 5,900 ft). Stage 2 is proposed to provide another 200 MW of generation and a 150 MW·h battery.[6]
The land is north of Goyder's Line and 6 kilometres (3.7 mi) north of the Goyder Highway on crown land unsuitable for cropping due to the low rainfall.[7]
Downer Group was engaged in January 2019 for early contractor involvement, with construction expected to commence in July 2019 and stage 1 to take two years to build. The project had provision for three more stages, depending on market and network conditions.[8] In July, the project's website said that construction would start in the fourth quarter of 2019.[9] By November 2019, this had slipped to the first quarter of 2020.[10]
Alinta Energy had committed to buy 75% of the solar farm's output for 15 years,[11][12] however that contract expired due to delays in the project caused by issues such as the withdrawal of Downer Group as EPC contractor.[13]
The grid-connected battery will be supplied by GE Renewable Energy. It is expected to be 100MW/300MWh, larger than any grid-connected batteries in the world at the time of its announcement in 2019.[14]
References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).