Murraylink

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Murraylink
Lua error in Module:Mapframe at line 703: attempt to index field 'wikibase' (a nil value).
Map of Murraylink
Location
CountryAustralia
CoordinatesLua error: callParserFunction: function "#coordinates" was not found.
Lua error: callParserFunction: function "#coordinates" was not found.
FromBerri, South Australia
ToRed Cliffs, Victoria
Ownership information
OwnerEnergy Infrastructure Investment
OperatorAPA Group
Construction information
Manufacturer of conductor/cableABB
Commissioned2002
Technical information
Typeunderground cable
Type of currentLight HVDC
Total length180 km (110 mi)
Power rating220 MW
AC voltage132 kV (Berri)
220 kV (Red Cliffs)
DC voltage±150 kV
No. of poles2

Murraylink is an Australian high voltage direct current electricity transmission link between Berri, South Australia and Red Cliffs, Victoria, connecting the two state electricity grids. Murraylink was commissioned in 2002 and is believed to be the world's longest underground transmission system and cost more than A$177 million. It was built by TransEnergie Australia, a subsidiary of Hydro-Québec. It was sold to the APA Group in March 2006 for A$153 million. In December 2008 ownership of Murraylink (as well as Directlink) was transferred to the newly formed Energy Infrastructure Investments Group, while APA continued as the operator.[1] The ownership of EII is APA with 19.9%, with the balance with Marubeni (49.9%) and Osaka Gas (30.2%).[2]

Capacity

[edit | edit source]

Murraylink consists of two 180-kilometre (110 mi) long bipolar HVDC cables.[3] The circuit has an operating voltage of 150 kV and a transmission capacity of 220 megawatts. The link operates an "HVDC Light" voltage-source converter system, utilising insulated-gate bipolar transistors (IGBT), to convert electricity between alternating current and direct current.

While Murraylink is rated at 220MW, it is unable to operate at capacity during periods of high demand due to limitations in the transmission infrastructure at either end.[4] The limitations relate to thermal overload of transformers or transmission lines supplying the Riverland (for South Australia to Victoria transmission) and western Victoria (for Victoria to South Australia transmission).[5]

Sites

[edit | edit source]
Site Coordinates
Red Cliffs Static Inverter Plant Lua error: callParserFunction: function "#coordinates" was not found.
Berri Static Inverter Plant Lua error: callParserFunction: function "#coordinates" was not found.

References

[edit | edit source]
  1. ^ Electricity Transmission Network Service Providers - Directlink and Murraylink amended Cost Allocation Methodologies - March 2010
  2. ^ electricity interconnectors
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
[edit | edit source]