Coordinates: 54°50′50″N 1°41′13″W / 54.8472°N 1.68694°W / 54.8472; -1.68694

Holmside Hall Wind Farm

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Holmside Hall Wind Farm
File:Craghead Windmills - geograph.org.uk - 84084.jpg
The two turbines of Holmside Hall
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
CountryEngland, United Kingdom
LocationStanley, County Durham
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
StatusOperational
Commission dateMay 2004
OwnerE.ON UK
Site elevation722 ft
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).
Nameplate capacity5.5 MW

Holmside Hall Wind Farm is a wind farm near Stanley, County Durham, England. Owned and operated by E.ON UK, the farm has a nameplate capacity of 5.5MW, containing two NM80 turbines each rated at 2.75 MW.[1]

At the time of construction, which was delayed due to high winds, the turbines were the largest and most powerful in the UK.[2]

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').