Slieve Rushen Wind Farm
Jump to navigation
Jump to search
The topic of this article may not meet Wikipedia's notability guideline for geographic features. (January 2022) |
| Slieve Rushen Wind Farm | |
|---|---|
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| Country | Northern Ireland, United Kingdom |
| Location | County Fermanagh |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Status | Operational |
| Construction began | July 2007 |
| Commission date | April 2008 |
| Construction cost | £900,000 |
| Operator | B9 Energy |
| Wind farm | |
| Type | Onshore |
| Power generation | |
| Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value). | |
| Nameplate capacity | 54 MW |
| Annual net output | 135 GWh |
Slieve Rushen Wind Farm is an 18-turbine wind farm in County Fermanagh, Northern Ireland, with a total capacity of 54 MW, enough to power over 30,000 homes.[1] It was commissioned in April 2008.[1]
See also
[edit | edit source]Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
References
[edit | edit source]- ^ a b UK Operational Wind Farms – Renewable UK Archived 2011-10-01 at the Wayback Machine Accessed 5 October 2011