Barrow Offshore Wind Farm
| Barrow Offshore Wind Farm | |
|---|---|
Barrow Offshore Wind Farm, April 2009 | |
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). Location of Barrow Offshore Wind Farm off the coast of England | |
| Country | England, United Kingdom |
| Location | East Irish Sea, south west of Walney Island, Barrow-in-Furness, Cumbria |
| Coordinates | Lua error in Module:Coordinates at line 611: attempt to index field 'wikibase' (a nil value). |
| Status | Operational |
| Commission date | 2006 |
| Owner | Ørsted A/S |
| Wind farm | |
| Distance from shore | 7 km (4 mi) |
| Hub height | 75 m (246 ft) |
| Rotor diameter | 90 m (300 ft) |
| Power generation | |
| Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value). | |
| Nameplate capacity | 90MW |
<mapframe zoom="12" text="Wind farm layout" height="240" latitude="53.9932" longitude="-3.2964" width="300">{"properties":{"stroke-width":6,"stroke":"#ff0000","title":"Barrow Offshore Wind Farm"},"type":"ExternalData","title":"Wind turbines Barrow.map","service":"page"}</mapframe> The Barrow Offshore Wind Farm is a 30 turbine 90MW capacity offshore wind farm in the East Irish Sea approximately seven kilometres (four nautical miles) southwest of Walney Island, near Barrow-in-Furness, Cumbria, England.
Construction of the wind farm took place between 2005 and 2006. The farm is operated by Barrow Offshore Wind Limited, owned by Ørsted A/S.
Planning and design
[edit | edit source]Barrow wind farm was a UK Round 1 wind farm development originally developed by Warwick Energy Limited.[1] A planning application was submitted in 2001,[2] and planning consent given in March 2003;[3] the project was sold to Centrica (25%, c.£22.5million), Ørsted A/S (then named DONG Energy) (37.5%), and Statkraft (37.5%) in Sep. 2003.[4][5] The estimated cost of developing the project was £100 million, of which £10million was provided by a UK government grant.[5][6] In 2004 Centrica and Ørsted bought the Statkraft stake, forming a 50:50 joint venture in the development.[7]
The initial Warwick Energy proposal was for a 30 turbine wind farm 7 km southwest of Walney Island (Cumbria), with a generating capacity of up to 108 MW; electrical power supply to the mainland was to be via a ~25 km long 132 kV cable making groundfall near Heysham, with connection to the mainland electrical grid at an extension to an existing electricity substation south of Heysham nuclear power station.[8] Turbines were expected to have ~50m radius blades, with a 75m hub height, and be in water at a depth of ~20 m, with a ~32.5 m sub-sea bed monopile foundation; the turbines were to be spaced approximately 500 m apart in four rows aligned to face the prevailing southwesterly winds, with a row spacing of ~750 m.[9]
Construction
[edit | edit source]
In July 2004 Kellogg Brown & Root Ltd and Vestas-Celtic Wind Technology Ltd were awarded the contract to install and commission the wind farm, and to operate the wind farm for five years.[10] A 30-turbine wind farm with a capacity of 90MW was constructed by the consortium between July 2005 and May 2006. The main construction base was at Harland and Wolff's shipyard in Belfast.[11] In exceptions where pile driving of monopile foundations failed, drilling was used to form the monopile foundations.[11][12]
IEC 1A class Vestas V90-3.0 MW wind turbines were used, mounted on a 75 m tower connected to 4.75 m (15 ft 7 in) monopiles supplied by a Sif/Smulders joint venture.[13] Turbine to offshore substation electric connection were at 33 kV, with the voltage stepped up to 132 kV at an offshore substation supplied by Areva T&D (transformer), Sif/Smulders (superstructure and monopile) and designed by KBR and Mott MacDonald. Cables were supplied by Prysmian (33 kV) and Nexans (132 kV).[14]
Construction of the wind farm was completed in June 2006 with the first power generated in March 2006.[15] The operator is Barrow Offshore Wind Limited, owned by Centrica and Ørsted.[1]
Operation
[edit | edit source]Since 2008 (to 2012) the farm operated at between 30 and 40% capacity factor, generating between 240 and 320 GWh of electrical energy per year.[16] Its levelised cost has been estimated at £87/MWh.[17]
In 2011 regulatory changes required Ørsted/Centrica to divest the electrical transmission assets of the wind farm, which were sold to TC Barrow OFTO Ltd. for £34 million.[18]
In 2014 Ørsted acquired Centrica's 50% holding in the wind farm.[19]
See also
[edit | edit source]- Ormonde Wind Farm, Walney Wind Farm, West of Duddon Sands Wind Farm – other nearby wind farms in the Irish Sea
- List of offshore wind farms in the United Kingdom
- List of tallest buildings and structures in Barrow-in-Furness
References
[edit | edit source]- ^ a b Barrow (4C Offshore) Developers/Owners/Operators
- ^ Barrow Offshore Wind Farm (LORC) Timeline & Track Records
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Barrow wind farm (Non technical summary) (Warwick Energy) pp.1–2
- ^ Barrow wind farm (Non technical summary) (Warwick Energy) pp.2–3
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Barrow Offshore Wind Farm (LORC) Turbine, Tower & Substructure
- ^ Barrow Offshore Wind Farm (LORC) Substations, Inter-Array & Export Cables
- ^ Barrow Offshore Wind Farm (Dong)
- ^ Barrow Offshore Wind Farm (LORC) Production and Performance
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
Sources
[edit | edit source]- Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
External links
[edit | edit source]- Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
Lua error in Module:Authority_control at line 153: attempt to index field 'wikibase' (a nil value).