Viborg Power Station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
Viborg Power Station
Viborg Power Station, July 2014 (photo: Kim Hansen)
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
CountryDenmark
LocationViborg
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
StatusOperational
Commission date1996
OwnerEnergi Viborg
Thermal power station
Primary fuelNatural gas
Combined cycle?Yes
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).
Nameplate capacity57 MW

Viborg Power Station (Danish: Viborg Kraftvarmeværk) is a natural gas-fired power station operated by Energi Viborg in Viborg, Denmark.

It can provide 57 MW of electric power from a General Electric Frame 6 gas turbine and a W.H.Allen steam turbine, and 57 MJ/s of district heating. It is used about 5,000 hours per year. The hot water tank contains 19,000 m3, suitable for 15 hours of cold weather consumption.[1]

The station is to be used as a hub for distributing district heating from the coming Apple data center near Foulum and Tjele. Consultants calculate that the best economy for Viborg's district heating is a system where Apple's cooling water is used to provide heat for 7 MWe heat pumps at the data center delivering 55 MJ/s of heating (and cooling for Apple), with an overall Coefficient of performance of 8. The transmission water temperature is raised from 30 to 50 °C and then pipelined 10 km to Viborg, where further heat pumps raise (and keep) the local heat to 60 °C. The start cost is estimated at DKK 316 million,[2] and running costs of DKK 265/MWh, compared to the 2017 price of DKK 413/MWh and natural gas at over DKK 500/MWh. Conversely, Apple's cooling water is lowered in temperature by the heat pumps. Viborg's expected heat demand is between 10 MJ/s in summer and 90 MJ/s (peak) in winter, for an annual consumption of 307 GWh. The heating difference between the 55 MJ/s heat from Apple and the 90 MJ/s peak demand is covered by gas boilers.[3]

See also

[edit | edit source]

Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').

References

[edit | edit source]
  1. ^ Facts about the plant Archived April 5, 2012, at the Wayback Machine Energi Viborg. Accessed: 6 December 2011.
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).[permanent dead link]
[edit | edit source]
  • Error creating thumbnail: File missing Media related to Lua error in Module:Commons_link at line 62: attempt to index field 'wikibase' (a nil value). at Wikimedia Commons
  • Energi Viborg Kraftvarme A/S at Energi Viborgs website (in Danish)