Coordinates: 0°02′53″S 110°06′29″E / 0.0481°S 110.1080°E / -0.0481; 110.1080

Tayan Bridge

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
Tayan Bridge

Jembatan Tayan
File:Jembatan Tayan.jpg
Tayan Bridge at night
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
Carries3 lanes of File:Tabliczka AH150.svg AH150 Trans-Kalimantan Highway Southern Route
CrossesKapuas River
LocaleSanggau Regency, West Kalimantan, Indonesia
Characteristics
DesignTruss arch bridge[1]
Total lengthtotal: 1,975 m (6,480 ft)[1]
300 m (984 ft) (Tayan to Tayan Island)
1,140 m (3,740 ft) (Tayan Island to Piasak)
Width11 m (36 ft)
Longest span200 m (660 ft)
Clearance below13 m (43 ft)
History
Construction startSeptember 2012
Construction end19 February 2016
Construction costRp 740 billion
Opened22 March 2016; 10 years ago (2016-03-22)
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Tayan Bridge (Indonesian: Jembatan Tayan) is a bridge that crosses Kapuas River in Sanggau, West Kalimantan, Indonesia. This bridge is a part of the Trans-Kalimantan Highway (southern route) that connects West Borneo with Central Borneo.[2] The bridge is one of the longest bridges in Borneo.[3] Construction of the bridge took around 900 days, and it opened to traffic on 22 March 2016.[4]

History

[edit | edit source]
File:KMP Silok 120326 0046 tyn.jpg
One of two ferries which connected Tayan and Piasak

Before the bridge was completed, vehicle crossing between Tayan and Piasak was served by two small[citation needed] ferries. It required 20 minutes to cross the river by ferry.[5]

Construction

[edit | edit source]

Construction of the bridge started in September 2012.[6] The construction project was mainly funded by a loan from China (90%)[7][8] and was built by China Road and Bridge Corporation.[9][10] The bridge costed 740 billion rupiahs.[10] The bridge was finished on 19 February 2016.[6]

The bridge was inaugurated by President of Indonesia, Joko Widodo, and opened on 22 March 2016.[4]

Description

[edit | edit source]
File:E 6.jpg
Trans-Kalimantan Highway in Tayan Bridge

The total length of this bridge is 1,975 meters while the width is about 11 meters. The bridge has 1 lane in each direction. The clearance of the bridge from the surface of river at the high water condition is 13 meters.[11]

The construction of the bridge was divided into two parts. The first part was a 300 meters bridge from Tayan town to Tayan Island, and the second part was a 1,140 meters bridge from Tayan Island to Piasak.[11] The bridge is expected to last for 100 years with maintenance.[4]

References

[edit | edit source]
  1. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  7. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  8. ^ Borneo News - Jembatan Tayan Siap Dibangun
  9. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  10. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  11. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).