Tasman Global Access

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Tasman Global Access
Cable typeFibre-optic
Construction beginning2016
Construction finished2017
First traffic2017
Design capacity20 tbit/s
Built byAlcatel Submarine Networks
Landing points2 (Raglan, New Zealand, Narrabeen, New South Wales)
Owner(s)Spark New Zealand, Telstra, Vodafone

Tasman Global Access (TGA) is a 2,288 km fibre-optic submarine communications cable that entered service in 2017, linking Australia and New Zealand. TGA consists of two fibre pairs and has a total design capacity of 20 terabits per second.[1]

See also

[edit | edit source]

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).