Sumed pipeline
| Sumed Pipeline | |
|---|---|
| Error creating thumbnail: Location of the Sumed Pipeline | |
| Location | |
| Country | Egypt |
| General direction | South–north |
| From | Ain Sokhna terminal |
| To | Sidi Kerir port |
| Runs alongside | Suez Canal |
| General information | |
| Type | Oil |
| Partners | EGPC, Saudi Aramco, IPIC, three Kuwaiti companies, QatarEnergy |
| Operator | Arab Petroleum Pipeline Company (Sumed Company) |
| Commissioned | 1977 |
| Technical information | |
| Length | 320 km (200 mi) |
| Maximum discharge | 2.5 million barrels per day (400×103 m3/d) |
The Sumed Pipeline (also known as the Suez-Mediterranean Pipeline) is an oil pipeline in Egypt, running from the Ain Sokhna terminal in the Gulf of Suez, the northernmost terminus of the Red Sea, to offshore Sidi Kerir port, Alexandria[1] in the Mediterranean Sea. It provides an alternative to the Suez Canal for transporting oil from the Persian Gulf region to the Mediterranean.
History
[edit | edit source]The project for an oil pipeline from the Red Sea to the Mediterranean commenced after the extended closure of the Suez Canal following the Six-Day War in June 1967.[2] Establishment of the pipeline company was agreed in 1973 between five Arab governments.[3] The Sumed pipeline was opened in 1977.[4][5]
Technical description
[edit | edit source]The Sumed pipeline is 320 kilometres (200 mi) long. It consists of two parallel lines of 42 inches (1,070 mm) diameter. Its capacity is 2.5 million barrels per day (400×103 m3/d).[5] In 2009 it carried 1.1 million barrels per day (170×103 m3/d).[6]
Operator
[edit | edit source]The pipeline is owned by the Arab Petroleum Pipeline Company/Sumed Company, a joint venture of EGPC (50%, Egypt), Saudi Aramco (15%, Saudi Arabia), IPIC (15%, the United Arab Emirates), three Kuwaiti companies (each of 5%), and QatarEnergy (5%, Qatar).
Proposed extension
[edit | edit source]An extension of the Sumed is being considered. The proposed extension would traverse the Red Sea from Ain Sukhna to the Saudi coast near Sharm al Sheikh, and from there to the terminal of Saudi Arabia's main east-west pipeline in Yanbu.
See also
[edit | edit source]Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).