Standard time is the amount of time that should be allowed for an average worker to process one work unit using the standard method and working at a normal pace. The standard time includes some additional time, called the contingency allowance, to provide for the worker's personal needs, fatigue, and unavoidable delays during the shift.

Prerequisite for Valid Time Standards

[edit | edit source]
  • The task is performed by an average worker
  • The worker's pace represents standard performance
  • The worker uses the standard method
  • The task is performed on a standard work unit

Calculating the Standard Time

[edit | edit source]

The standard time (Ts) is calculated from multiplying the observed time (To) by the performance rating (R) and the personal need, fatigue and unavoidable delays (PFD): Ts = To*R*(1+PFD)

Usages for Standard Time

[edit | edit source]
  • Estimate the quantity of the production
  • Determine workforce size and equipment requirement
  • Compare alternative methods
  • Evaluate worker's performance
  • Plan and schedule production and estimate co.

Further reading

[edit | edit source]
  • Work Systems: The Methods, Measurement & Management of Work by Mikell P. Groover, Prentice-Hall (2006) Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  • Work Measurement and Methods Improvement by Lawrence S. Aft, Wiley (2000) Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).