Small Dean Viaduct
Jump to navigation
Jump to search
Small Dean Viaduct | |
|---|---|
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Carries | High Speed 2 |
| Crosses | A413 road |
| Locale | Wendover |
| Characteristics | |
| Total length | 345 m (1,132 ft) |
| No. of spans | 6 |
| Rail characteristics | |
| No. of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrified | 25 kV 50 Hz AC |
| History | |
| Architect | Moxon Architects |
| Designer | ASC (Arcadis, Setec and COWI) |
| Constructed by | EKFB (Eiffage, Kier, Ferrovial, BAM Nuttall) |
| Location | |
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
Small Dean Viaduct is a viaduct currently under construction in Buckinghamshire which will carry the High Speed 2 railway line.
Approval for the viaduct was granted by Buckinghamshire Council in April 2023.[1]
The viaduct is 345 metres (1,132 feet) long and will pass over the A413 road which will be realigned.[1] A shared-use path will also be provided.[2]
The viaduct will have a low profile with the underside of the viaduct 6 metres (20 feet) above the road surface below. It will be supported by five Y-shaped piers and girders made from weathering steel.[3]
References
[edit | edit source]- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).