Simba Cement Uganda Limited
| Company type | Private |
|---|---|
| Industry | Manufacturer and distributor of cement |
| Founded | May 2018[1] |
| Headquarters | Tororo, Uganda |
Key people | Narendra Raval Managing Director[1] |
| Products | Cement |
Number of employees | ~ 400 (2018)[1] |
Simba Cement Uganda Limited (SCUL), also National Cement Company Uganda, is a cement manufacturer in Uganda. It is a subsidiary of National Cement Company Limited, the construction materials manufacturer based in Kenya.[2][3] National Cement is itself a subsidiary of the Devki Group of Companies.[4][5]
Location
[edit | edit source]The factories and main offices of SCUL are located off of the Tororo–Mbale Road, in Nyakesi Village, Nyakesi Parish, Rubongi sub-county, in Tororo District, approximately 9 kilometres (6 mi), by road north of the central business district of the town of Tororo.[6] The coordinates of the Simba Cement Uganda Limited Complex are: 0°44'05.0"N, 34°11'02.0"E (Latitude:0.734709; Longitude:34.183878).[7]
Overview
[edit | edit source]The new cement factory has an installed production capacity of one million metric tonnes annually. It was developed at an estimated cost of US$185 million. Other credible sources have estimated cost at US$199 million.[3] Commercial production started during the first half of 2018.[8] Installed capacity production is 3,000 metric tonnes daily, which translates to about 800,000 metric tonnes annually.[9]
Ownership
[edit | edit source]SCUL is a wholly owned subsidiary of National Cement Company Limited (NCCL) based in Kenya.[3][10] The shareholding in National Cement Kenya, the parent of Simba Cement Uganda Limited, is as illustrated in the table below:[11]
| Rank | Name of Owner | Percentage Ownership |
|---|---|---|
| 1 | Devki Group owned by Narendra Raval and Family | 85.0 |
| 2 | International Finance Corporation (IFC) | 7.5 |
| 3 | IFC Subsidiary Company | 7.5 |
| Total | 100.0 |
Construction
[edit | edit source]The main contractor was Mepani Technical Services Limited. The construction of the factory (excluding equipment and systems), cost an estimated US$55 million, and took two and one half years. Official commissioning took place on 29 August 2018.[1]
See also
[edit | edit source]References
[edit | edit source]- ^ a b c d Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
External links
[edit | edit source]- New cement factory opens in Tororo As of 26 July 2017. (Video).
- Uganda: Two New Cement Plants In Tororo By 2018
Lua error in Module:Authority_control at line 153: attempt to index field 'wikibase' (a nil value). Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).