Sihuangziping Pilot Geothermal Power Plant
Jump to navigation
Jump to search
| Sihuangziping Pilot Geothermal Power Plant | |
|---|---|
| File:四磺子坪E-303號地熱探勘井.jpg | |
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| Official name | 四磺子坪先導地熱發電廠 |
| Location | Jinshan, New Taipei, Taiwan |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Status | Under construction |
| Commission date | October 2023 |
| Power generation | |
| Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value). | |
| Nameplate capacity | 1 MW |
| Annual net output | 6.4 GWh |
The Sihuangziping Pilot Geothermal Power Plant (traditional Chinese: 四磺子坪先導地熱發電廠; simplified Chinese: 四磺子坪先导地热发电厂; pinyin: Sìhuángzipíng Xiāndǎo Dìrè Fādiànchǎng) is an upcoming geothermal power plant in Jinshan District, New Taipei, Taiwan. It is the first power plant in Taiwan powered by a volcano.
History
[edit | edit source]The power plant will be commissioned by the end of October 2023.[1]
Technical specifications
[edit | edit source]The power plant received its energy sources from Tatun Volcanic Group. It has an installed capacity of 1 MW and can generate 6.4 GWh of electricity per year.[1]
See also
[edit | edit source]References
[edit | edit source]