Sequence step algorithm
Jump to navigation
Jump to search
This article needs additional citations for verification. (December 2022) |
A sequence step algorithm (SQS-AL) is an algorithm implemented in a discrete event simulation system to maximize resource utilization.[1] This is achieved by running through two main nested loops: A sequence step loop and a replication loop. For each sequence step, each replication loop is a simulation run that collects crew idle time for activities in that sequence step. The collected crew idle times are then used to determine resource arrival dates for user-specified confidence levels. The process of collecting the crew idle times and determining crew arrival times for activities on a considered sequence step is repeated from the first to the last sequence step.[2]
See also
[edit | edit source]References
[edit | edit source]Further reading
[edit | edit source]- Photios G. Ioannou and Chachrist Srisuwanrat Sequence Step Algorithm for Continuous Resource Utilization in Probabilistic Repetitive Projects
- Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).