CountryChina
LocationSanmen County, Taizhou, Zhejiang
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
StatusOperational
Construction beganUnit 1: 19 April 2009
Unit 2: 15 December 2009
Commission dateUnit 1: 21 September 2018
Unit 2: 5 November 2018
Construction cost50 billion yuan (7.3 billion USD) for the whole two AP1000 reactor plant [1]
OwnerChina National Nuclear Corporation (CNNC) [2]
OperatorsSanmen Nuclear Power[2]
(subsidiary of CNNC)[3]
Nuclear power station
Reactor typePWR
Reactor supplierWestinghouse
Cooling sourceShefan Channel
Thermal capacity2 × 3400 MWth (operational)
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).
Nameplate capacity2314 MW
External links
Websitewww.smnpc.com.cn/%20www.smnpc.com.cn

The Sanmen Nuclear Power Station (Chinese: 三门核电站) is a nuclear power station in Sanmen County, Zhejiang, China. Sanmen is the first implementation of the AP1000 pressurized water reactor (PWR) developed by Westinghouse Electric Company.

History

[edit | edit source]

The contract for the plant was agreed in July 2007.[4] Announcement of the project start came roughly twelve months after Westinghouse won a bidding contest over other companies. The contract for the new plant involved The Shaw Group (now part of Westinghouse), a minority shareholder in Westinghouse. Westinghouse was controlled by Japanese Toshiba. The Shaw Group did provide engineering, procurement, commissioning, information management and project management services.[4]

The first pair of reactors were estimated to cost CNY 32.4 billion yuan, later estimates in 2013 gave figures of CNY 40.1 billion ($6.12 billion USD).[5] The final sum was CNY 10 billion yuan higher.[6]

Groundbreaking for the first and second units was held 26 February 2008.[7][8] Excavation for the first unit was completed in September 2008. Quality of the pit was certified, putting the project 67 days ahead of schedule.[9] Construction of Sanmen Unit 1 began on 19 April 2009, as the first 5,200 m3 of concrete were poured for the foundation, in a ceremony attended by State Nuclear Power Technology Corporation (SNPTC) chair Wang Binghua and Westinghouse CEO Aris Candris.[10][11] First concrete for Sanmen 2 was poured on 15 December 2009.[12]

In June 2014, China First Heavy Industries completed the first domestically produced AP1000 reactor pressure vessel for the second AP1000 unit.[13]

The units were originally projected to begin operation in 2014 and 2015. In April 2015, a start date of 2016 was projected for both.[14] One month later, the start date was put back to 2017.[15][16] In January 2017 China National Nuclear Corporation (CNNC) announced that the final reactor coolant pump had been installed with start of operations still foreseen for 2017.[17] As of March 2018, Sanmen 1 had completed pre-fuelling safety checks but was not expected to be connected to the grid until the fall of 2018 at the earliest.[18] Hot testing of Sanmen 1 was completed in June 2017, and fuel loading started on 25 April 2018. It subsequently became the first AP1000 reactor in the world to achieve first criticality at 2:09 AM on 21 June 2018,[19] and was connected to the grid on 30 June 2018.[20] Sanmen Unit 1 entered into commercial operation on 21 September 2018.[21]

Sanmen Unit 2 achieved first criticality on 17 August 2018 and was connected to the grid on 24 August 2018. Full-power demonstration testing was completed on 5 November 2018, and the unit is now considered to be in commercial operation.[22][23]

In March 2019 Sanmen Unit 2 shut down because of a reactor coolant pump defect, with the root cause still under investigation.[24] A replacement pump has been shipped from the United States by Curtiss-Wright. There have been previous problems with these pumps with impeller blade quality, which involved the return of three pumps to the U.S. in 2013.[25][26]

Reactor data

[edit | edit source]

The Sanmen Nuclear Power Plant consist of 2 operational reactors.[27]

Unit Type / Model Net capacity Gross capacity Thermal capacity Construction
start
First
criticality
Grid
connection
Commercial
operation
Notes
Phase I
Sanmen 1 PWR / AP1000 1157 MW 1251 MW 3400 MW 19 April 2009 2018-06-21 30 June 2018 2018-09-21 [28]
Sanmen 2 PWR / AP1000 1157 MW 1251 MW 3400 MW 15 December 2009 2018-08-17 24 August 2018 2018-11-05 [29]
Phase II
Sanmen 3 PWR / CAP1000 1163 MW 1251 MW 3400 MW 28 June 2022 [30]
Sanmen 4 PWR / CAP1000 1163 MW 1251 MW 3400 MW 22 March 2023 [31][32]
Phase III
Sanmen 5 PWR / Hualong One 1000 MW 1215 MW 3400 MW [33]
Sanmen 6 PWR / Hualong One 1000 MW 1215 MW 3400 MW [33]

Groundwork for units 3 and 4 have been carried out, but during the process, the project nearly came to a standstill. This comes due to delays with CAP-1000 projects. However, on 20 April 2022, permission to resume construction on the two units was approved by the State Council.[34]

See also

[edit | edit source]
Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  7. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  8. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  9. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  10. ^ "1st phase of Sanmen nuclear plant under construction in E China Archived 2009-04-23 at the Wayback Machine". Xinhua. 19 April 2009.
  11. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  12. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  13. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  14. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  15. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  16. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  17. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  18. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  19. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  20. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  21. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  22. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  23. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  24. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  25. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  26. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  27. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  28. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  29. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  30. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  31. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  32. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  33. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  34. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
[edit | edit source]