Sachal Wind Power Project
Jump to navigation
Jump to search
This article relies largely or entirely on a single source. (March 2021) |
| Sachal Wind Power Project | |
|---|---|
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| Country | Pakistan |
| Location | Jhimpir |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Status | Completed in April 2017 |
| Construction began | April 2015 |
| Commission date | 2017 |
| Site area | 2.75 km2 (1.06 mi2) |
| Power generation | |
| Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value). | |
| Nameplate capacity | 49.5MW |
| Annual net output | 136.5 GW/h |
Sachal Wind Power Project is a wind farm with a total capacity of 49.5MW which corresponds to an annual production of approximately 136.5 GW. It is located in Jhimpir, (Pakistan) and located on an area of 2.75 km2 (1.06 mi2).[1]
References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
External links
[edit | edit source]- Sachal Wind Power Project map at Engineering Historical Memory