Project Hurunui
| Hurunui Windfarm | |
|---|---|
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| Location | North Canterbury |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Status | Proposed; resource consent granted but has lapsed with time |
| Owner | Meridian Energy |
| Power generation | |
| Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value). | |
| Nameplate capacity | 76 MW[1] |
Project Hurunui is a proposed wind farm located between Omihi and Greta Valley in north Canterbury, New Zealand. Meridian Energy proposed the wind farm; in 2013 it received resource consent from the Environment Court, though this consent lapsed in 2023.
History
[edit | edit source]The proposal as of 2011 was for a wind farm of 33 turbines, with maximum height of 130.5 metres, located on a 34 km2 area on the east side of State Highway 1.[1]
Meridian Energy began consultations on the project in April 2010.[2] An informal survey of residents in the affected area showed that slightly more were in favour of the wind farm than those who were opposed.[3]
The application for consents was lodged in February 2011,[4] and notified in April 2011.[1] In June 2011, the Hurunui District Council and the Canterbury Regional Council agreed to a request by Meridian that the wind farm proposal be referred to the Environment Court.[5] Consent was granted by the Environment Court in April 2013,[6] though one of the conditions was that the consent lapsed if "not given effect to within ten years".[7]
In February 2021 Meridian said that the company wanted to see more demand in the South Island before developing more generation there.[8] which is planned to produce up to 75.9 MW from 2014.[9]
As of 2024, the Hurunui project does not appear in Meridian's webpage of projects.[10]
See also
[edit | edit source]References
[edit | edit source]- ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Meridian Energy Limited v Hurunui District Council [2013] NZEnvC 261 (4 November 2013) https://www.nzlii.org/cgi-bin/sinodisp/nz/cases/NZEnvC/2013/261.html "In accordance with section 125(1) of the Resource Management Act 1991, this resource consent will lapse if not given effect to within ten years of commencement."
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
External links
[edit | edit source]