Pare Hydro Electric Project

From Wikipedia, the free encyclopedia
(Redirected from Pare HEP)
Jump to navigation Jump to search

The Pare Hydro Electric Project is a NTPC NEEPCO situated in the Dikrong River which is a tributary of Brahmaputra River in the Papum Pare District of Arunachal Pradesh.Total installed capacity of project is 110 MW[1][2]

The project was constructed by four contractors:[3]

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).