Otis Bridge
Otis Bridge | |
|---|---|
| File:Otis District (Paco Pandacan; 07-08-2023) E911a 27.jpg View of the bridge northeastbound | |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Carries | Vehicular traffic and pedestrians |
| Crosses | Estero de Concordia |
| Locale | Paco, Manila, Philippines |
| Maintained by | Department of Public Works and Highways – South Manila District Engineering Office[1] |
| Characteristics | |
| Design | Girder bridge |
| Material | Concrete |
| Total length | 80 m (260 ft) |
| Width | 12 m (39 ft) |
| No. of spans | 1 |
| Load limit | 15 metric tons (15,000 kg) |
| No. of lanes | 6 (3 lanes per direction) |
| History | |
| Constructed by | Department of Public Works and Highways |
| Opened | 1968 (original bridge) December 4, 2018 (new bridge) |
| Rebuilt | 2015 |
| Location | |
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
The Otis Bridge is a six-lane girder bridge crossing the Estero de Concordia, a tributary of the Pasig River, in Manila, Philippines. Constructed in 1968, it carries Paz Mendoza Guazon Street, formerly known as Otis Street (named after the American Governor-General Elwell Stephen Otis). The bridge is a major artery for commercial vehicles carrying cargo from the Port of Manila,[2] with around 10,000 trucks crossing the bridge daily.[3]
In 2015, the bridge was slated for replacement or reconstruction as it neared the end of its 50-year service life,[3] with ₱37,000,000 initially being allocated for construction work by the Department of Public Works and Highways (DPWH).[4] However, on June 26, 2018, the bridge was ordered closed by the Metropolitan Manila Development Authority (MMDA) on the advice of the Manila Disaster Risk Reduction Management Council[5] after media reports showed that 20-foot (6.1 m) long cracks started appearing along the center island, caused by the number of overloaded trucks that used the bridge,[6] as well as construction work on the nearby Concordia Bridge which prevented its timely replacement.[4]
The bridge was reopened on December 4, 2018, three months ahead of the March 2019 target date, with ₱217,000,000 being allocated from the national budget for its replacement.[7][3] Construction took place 24/7 in phases until the project was completed.[6][8]
External links
[edit | edit source]- Error creating thumbnail: File missing Media related to Lua error in Module:Commons_link at line 62: attempt to index field 'wikibase' (a nil value). at Wikimedia Commons
References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).