Novatec Solar
This article needs additional citations for verification. (June 2023) |
Novatec Solar is a German provider of solar boilers using linear Fresnel collector technology based in Karlsruhe. Novatec Solar specialises in turnkey solutions, including the manufacture, supply, and assembly of solar fields.
Timeline
[edit | edit source]In March 2011, ABB acquired 35% of Novatec Solar.[1][2][3]
In April 2013, ABB sold its stake in Novatec Solar to existing shareholder Transfield Holdings. After the transaction, Transfield owned approximately 85% of Novatec Solar.[1]
In November 2014, Novatec announced to its bondholders that due to financial problems it was seeking a restructuring of its debt.[2] Andreas Wittke (CEO) and Oliver Mundle (CFO) resigned their positions in the same month.[4]
Projects
[edit | edit source]Novatec Solar has completed three projects with its linear Fresnel technology.
Puerto Errado 1, located in southern Spain's Calasparra, was connected to the grid in 2009. With a capacity of 1.4 MW of electrical output, it was the first commercial Fresnel power plant in the world. It has a mirror surface of 18,000 m² divided in two collector rows with a length of 800 m each.
- Puerto Errado 2
Puerto Errado 2 is located next to Puerto Errado 1 in southern Spain. It has a capacity of 30MW electric and a mirror surface of 300,000 m² and is in commercial operation since 2012.[citation needed]
- Liddell
The Liddell solar field was commissioned in 2010. It has a capacity of 9MW thermal and was used as a fuel saver for the Liddell Power Station.
References
[edit | edit source]- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).