NordLink
| NORD.LINK | |
|---|---|
| Lua error in Module:Mapframe at line 703: attempt to index field 'wikibase' (a nil value). Location of NORD.LINK | |
| Location | |
| Country | Norway Germany |
| From | Ertsmyra, Norway |
| Passes through | North Sea |
| To | Büsum shore and Wilster substation, Germany[1] |
| Ownership information | |
| Partners | Statnett TenneT TSO / KfW |
| Construction information | |
| Commissioned | May 2021 |
| Technical information | |
| Type | submarine cable, land cable, overhead line |
| Type of current | HVDC |
| Total length | 625 km (388 mi) |
| Power rating | 1,400 MW |
| DC voltage | 500 kV |
| No. of poles | 2 |
| No. of circuits | 1 |
NordLink is a subsea 1,400 megawatt (MW) HVDC power cable between Norway and Germany, opened in May 2021.[2] The 625 kilometres (388 mi) long line operates at a voltage of 500 kV DC.[3][4] It consists of 54 kilometres long land cable in Schleswig-Holstein, Germany, a 516 kilometres long submarine cable between Germany and Norway and a 53 kilometres long overhead line with 140 towers in Norway.
Construction
[edit | edit source]It is estimated to cost €1.5–2 billion,[5] which was financed in 2015[6] when Statnett decided to realize the project.[7] The interconnector was installed between a new substation at Ertsmyra (near Tonstad) in Norway and Wilster substation[1] in Schleswig-Holstein in Germany.[8] The connection was expected to be completed in 2020.[6][9] When testing in September 2020, it accidentally imported the full 1,400 MW into Norway for almost a minute, causing cascading grid effects such as a 0.5 Hz frequency change across the Nordic synchronous area.[10][11] The opening ceremony took place on 27 May 2021.[2]
Operation
[edit | edit source]In November 2021, amid high demand for electricity in Europe, the increased exports from Norway to continental Europe caused conflict with the grid operator of Sweden, which cut export capacity in half, causing the Norwegian operator to do the same for exports to Sweden (on which Denmark and Finland also rely).[12] Grid constraints inside Norway and Germany sometimes restrict NordLink capacity to less than maximum.[13][14]
Ownership
[edit | edit source]The Norwegian state-owned company and transmission system operator, Statnett SF, owns 50% of the project, whilst the Dutch transmission system operator TenneT TSO and the German state-owned bank KfW own the other half. A cable between Norway and Germany is listed in the EU's projects of common interest (PCI).[3][15]
Sites
[edit | edit source]| Site | Coordinates |
|---|---|
| Tonstad HVDC converter station | Lua error: callParserFunction: function "#coordinates" was not found. |
| Djupvik Cable Terminal | Lua error: callParserFunction: function "#coordinates" was not found. |
| Wilster HVDC converter station | Lua error: callParserFunction: function "#coordinates" was not found. |
Waypoints
[edit | edit source]- Overhead Line in Norway
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
- Lua error: callParserFunction: function "#coordinates" was not found.
See also
[edit | edit source]External links
[edit | edit source]- Official website
- Short presentation on YouTube – ABB to link Norwegian and German power grids
- 4c page
- Weekly exchange (Nord Pool data)
References
[edit | edit source]- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lie, Øyvind. "Statnett bygger kraftkabel til Tyskland" (tr. "Statnett is building a power cable to Germany") Teknisk Ukeblad, 10 February 2015. Retrieved : 22 February 2015.
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Nordic Grid Development Plan 2014 Archived 2015-01-04 at the Wayback Machine" page 59, Document no. 13/81818 - 5. Nordic TSOs, August 2014. Retrieved : January 2015.
- Electrical interconnectors to and from the Nordic grid
- Electrical interconnectors to and from the Synchronous Grid of Continental Europe
- HVDC transmission lines
- Electric power infrastructure in Norway
- Electric power transmission systems in Germany
- Electrical interconnectors in the North Sea
- Germany–Norway relations