Nexen Building
| Nexen Building | |
|---|---|
| File:Frozen Calgary (Nexen Building).jpg | |
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| General information | |
| Status | Occupied |
| Type | Office |
| Location | Calgary, Alberta, Canada |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Completed | 1982 |
| Cost | $121,931,465[citation needed] |
| Owner | Ursataur Capital Management |
| Height | |
| Roof | 152 m (499 ft)[1] |
| Technical details | |
| Floor count | 37 |
| Floor area | 55,855 m2 (601,220 sq ft)[2] |
| Design and construction | |
| Architects | CPV Group Architects and Engineers |
| Main contractor | CANA Construction Company |
801 Seventh Avenue S.W., commonly known as the Nexen Building, is a high rise office building in downtown Calgary, Alberta, Canada.[3]
It is a 37-storey skyscraper, with a height of 153 m (502 ft).[1] It was designed by CPV Group Architects and Engineers Ltd and built by CANA Construction Company Limited. The late-modernist building was completed in 1982.
The Nexen Building employs a composite stub-girder steel-frame floor system,[4] originally developed in part by Joseph Colaco.[5]
It is unique in that it is one of the few buildings in Calgary that do not follow the traditional grid pattern of the downtown core. Instead of facing south–north, or east–west, it stands diagonally.
Tenants
[edit | edit source]The original tenant of the Nexen Building was the NOVA Corporation.[6] In 2000, the building became Nexen's headquarters.[6] Nexen was purchased by Chinese state-owned CNOOC in 2013 and reduced its workforce over time.[6][7]
Nexen moved from the Nexen Building in 2019, instead subleasing 8 floors of The Bow from Cenovus, leaving the Nexen Building vacant from 2019 to 2025[8][9]
In 2025 the University of Calgary's School of Architecture, Planning and Landscape announced they are leasing the Annex and 9 floors of the Nexen Building.[10][11][12] An unnamed Data Centre is also leasing 1 floor.[11]
See also
[edit | edit source]References
[edit | edit source]- ^ a b Emporis. Nexen Building
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Stringer, David C. "Staggered Truss and Stub Girder Framing Systems in Western Canada Archived 2011-07-06 at the Wayback Machine". Technical paper published by the Canadian Steel Construction Council. 1982. Retrieved on January 20, 2009.
- ^ Colaco, Joseph P. "A Stub-Girder System for High-Rise Buildings[permanent dead link]". Technical paper presented at the AISC National Engineering Conference, New York. May 1972. Retrieved on January 20, 2009.
- ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).