NetPoint
Jump to navigation
Jump to search
| NetPoint | |
|---|---|
| NetPoint Screenshot Screenshot of NetPoint Version 3. | |
| Developer | PMA Technologies |
| Stable release | Version 4.2
/ April 17, 2014 |
| Repository |
|
| Written in | C++ |
| Engine | |
| Operating system | Microsoft Windows |
| Type | Project management software |
| License | Proprietary |
| Website | PMA Technologies Homepage |
NetPoint is a graphically-oriented project planning and scheduling software application first released for commercial use in 2009. NetPoint's headquarters are located in Chicago, Illinois. The application uses a time-scaled activity network diagram to facilitate interactive project planning and collaboration. NetPoint provides planning, scheduling, resource management, and other project controls functions.[1]
NetPoint is capable of calculating schedules using both the Critical Path Method (CPM)[2] as well as the Graphical Path Method (GPM).[1]
Schedules created in NetPoint can be exported for use in Primavera, Microsoft Project, and other CPM-based Project management software.
See also
[edit | edit source]- Project planning
- Project management
- Project management software
- Comparison of project management software
- Schedule (project management)
- Critical path method
References
[edit | edit source]- ^ a b Mubarak, Saleh (2010). Construction Project Scheduling and Control, Second Edition. John Wiley and Sons. Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value)..
- ^ O'Brien, James J.; Plotnick, Fredric L. (2010). CPM in Construction Management, Seventh Edition. McGraw Hill. Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value)..