NetPoint

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
NetPoint
DeveloperPMA Technologies
Stable release
Version 4.2 / April 17, 2014
Repository
  • {{URL|example.com|optional display text}}Lua error in Module:EditAtWikidata at line 29: attempt to index field 'wikibase' (a nil value).
Written inC++
Engine
    Lua error in Module:EditAtWikidata at line 29: attempt to index field 'wikibase' (a nil value).
    Operating systemMicrosoft Windows
    TypeProject management software
    LicenseProprietary
    WebsitePMA Technologies Homepage

    NetPoint is a graphically-oriented project planning and scheduling software application first released for commercial use in 2009. NetPoint's headquarters are located in Chicago, Illinois. The application uses a time-scaled activity network diagram to facilitate interactive project planning and collaboration. NetPoint provides planning, scheduling, resource management, and other project controls functions.[1]

    NetPoint is capable of calculating schedules using both the Critical Path Method (CPM)[2] as well as the Graphical Path Method (GPM).[1]

    Schedules created in NetPoint can be exported for use in Primavera, Microsoft Project, and other CPM-based Project management software.

    See also

    [edit | edit source]

    References

    [edit | edit source]
    1. ^ a b Mubarak, Saleh (2010). Construction Project Scheduling and Control, Second Edition. John Wiley and Sons. Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value)..
    2. ^ O'Brien, James J.; Plotnick, Fredric L. (2010). CPM in Construction Management, Seventh Edition. McGraw Hill. Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value)..
    [edit | edit source]