Mintia-Deva Power Station
| Mintia-Deva Power Plant | |
|---|---|
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| Country | Romania |
| Location | Hunedoara County |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Status | Mothballed |
| Commission date | 1969 |
| Owner | Mass Group Holding |
| Power generation | |
| Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value). | |
The Mintia-Deva Power Plant was Romania's third largest thermal power plant having 5 identical groups of 210 MW each and one of 235 MW thus totalling a capacity of 1285 MW.[1] The primary fuel was Bituminous coal mixed with Natural gas.
The power plant is situated in the Hunedoara County (South-Eastern Transylvania), on the banks of the Mureș, 7 kilometres (4.3 mi) from the city of Deva.The 3 chimneys of the power station are 220 meters tall.
Operations
[edit | edit source]The plant has been mothballed in early 2021. Reasons cited are lack of investment in emissions control, several years of poor management and political interference in the plant's management.
It was controlled by Electrocentrale Deva, a state-owned company. It was sold in 2022 to Mass Group Holding, an Iraqi company with headquarters in Jordan, for EUR 91.2 million.The transaction comes with strings attached, imposed by the Romania’s energy ministry, as a shareholder. These include the obligation for the buyer to complete a new 1,290 MW power unit, of which 800 MW is to be based on Natural gas and renewable sources, by the end of 2026.[2]
| Unit | Capacity (MW) | Commissioned | Status |
|---|---|---|---|
| Mintia - 1 | 210 | 1969[3] | decommissioned |
| Mintia - 2 | 210 | 1969 - 1971 | decommissioned |
| Mintia - 3 | 210 | 1969 - 1971 | decommissioned |
| Mintia - 4 | 210 | 1969 - 1971 | decommissioned |
| Mintia - 5 | 210 | 1977 | decommissioned |
| Mintia - 6 | 235 | 1980 | decommissioned |
See also
[edit | edit source]Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
External links
[edit | edit source]- Mintia-Deva Power Plant official site (in Romanian)