Milan Metro Line 3

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
M3
File:Milano linea M3.svg
File:Milano metropolitana Lodi TIBB.JPG
Lodi T.I.B.B. station
Overview
StatusOperational
Line number3
LocaleMilan, Italy
Termini
Connecting linesFile:Milano linea M1.svg File:Milano linea M2.svg File:Milano linea M4.svg File:Milano linea M5.svg
Stations21
Service
TypeRapid transit
SystemMilan Metro
Operator(s)Azienda Trasporti Milanesi
Depot(s)Rogoredo Depot
Rolling stockUdT series 8000/8100
AnsaldoBreda Meneghino
Daily ridership250,000 (2012)[1]
History
Opened3 May 1990
Technical
Line length17.1 km (10.6 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC overhead catenary
Route map
File:Milano - mappa metropolitana M3.svg

Line 3 (Linea Tre in Italian, also known as M3) is an underground line in Milan, Italy. This line is part of the Milan Metro and operated by ATM. Construction began in 1981 in order to be ready for the 1990 Football World Cup. It is also called the Yellow Line (Linea Gialla) as identified by its yellow signage.

The line connects the southeastern suburb of San Donato Milanese to the northwestern area of the city, travelling through the city centre. It is 17.1 km long and has 21 stations.[2]

History

[edit | edit source]
File:Metro-milano-interno-a.jpg
Inside an original line M3 train.

The proposal for a third metro line was approved by the municipal government of Milan in 1977. The route was chosen based on a study of main traffic routes in previous years. The final projected route was presented in early 1981. Works on the new line began on 8 September in the same year.[3] The first section, from Centrale to Duomo opened on 3 May 1990, just in time for the beginning of the World Cup. However, only a shuttle service was active between the two terminus. The line was extended to Porta Romana at the end of the year.[4]

New extensions to Sondrio to the north and to San Donato to the south opened on 12 May 1991.[5]

Further extensions of the new line happened slowly in the following years. Zara station was inaugurated only on 16 December 1995 and Maciachini on 8 December 2003.[5] The last extension (Maciachini-Comasina) opened in early 2011.[6]

Route

[edit | edit source]

The line, 16.6-kilometre long with 21 stations, runs from Comasina to San Donato, entirely underground

Station Name Transfer Opening
Comasina 26 March 2011
Affori FN File:Milano S2 (2025).svg File:Milano S4 (2025).svg File:Milano S12 (2025).svg File:Tren.svg
Affori Centro
Dergano
Maciachini 8 December 2003
Zara File:Milano linea M5.svg 16 December 1995
Sondrio 12 May 1991
Centrale FS File:Milano linea M2.svg File:Tren.svg 3 May 1990
Repubblica File:Milano S1 (2025).svg File:Milano S2 (2025).svg File:Milano S5 (2025).svg File:Milano S6 (2025).svg File:Milano S13 (2025).svg
Turati
Montenapoleone
Duomo File:Milano linea M1.svg
Missori File:Milano linea M4.svg (Sforza-Policlinico) 16 December 1990
Crocetta 6 December 1990
Porta Romana
Lodi T.I.B.B. File:Milano S9 (2025).svg 12 May 1991
Brenta
Corvetto
Porto di Mare
Rogoredo FS File:Milano S1 (2025).svg File:Milano S2 (2025).svg File:Milano S13 (2025).svg File:Tren.svg
San Donato

Rolling stock

[edit | edit source]

Trains use an overhead contact system providing a voltage of 1,500 V DC. The track gauge is of the 1,435 mm (4 ft 8+12 in) standard gauge.

As of 2020, there are two types of rolling stocks being used on the line:

  • The 8000-series, introduced between 1989 and 2003, and divided into three subseries:
    • "Standard" 8000-series - built by a consortium of Breda, Fiat Ferroviaria and OMS, with GTOVVVF inverters made by ABB.
    • "8080" series - built by Socimi, with GTO–VVVF inverters made by Hitachi. Decommissioned.
    • 8100-series - air-conditioned, open gangway version of the older 8000-series, introduced in 2003 for the line's extension to Machiachini.
  • 900 Series "Meneghino", introduced in 2011 for the line's extension to Comasina.

Planned extension

[edit | edit source]

A southeastern extension of the line has been planned. The new extension will run from San Donato through the municipalities of San Donato Milanese, Peschiera Borromeo, Mediglia, Pantigliate, Settala and finish in Paullo. The extended section will be 14.8 km (9.2 mi) long and has 6 stations. Trains will run mostly underground (60%).[7]

Although the project was approved in 2010, it was put on hold in early 2011 due to lack of funds.[8] Works were postponed to a later date.[9]

Currently there are plans to replace 48 lifts and 52 elevators for the Milan-Cortina Winter Olympics in 2026.[10]

Notes and references

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  7. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  8. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  9. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  10. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
[edit | edit source]