Metrorrey Line 1

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
Line 1
File:Linea1mty.svg
File:0019 arriving at Talleres Station.jpg
Train at Talleres station.
Overview
StatusOperational
LocaleMonterrey
Termini
Stations19
Service
TypeRapid transit
SystemMetrorrey
Operator(s)Sistema de Transporte Colectivo Metrorrey
History
Opened25 April 1991; 35 years ago (1991-04-25)
Technical
Line length18.828 km (11.699 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Talleres
San Bernabé
Unidad Modelo
Aztlán
Penitenciaría
Alfonso Reyes
Mitras
Simón Bolívar
Hospital
Edison
Central
Cuauhtémoc File:Linea2mty.svg
Del Golfo
Félix U. Gómez
Parque Fundidora
Y Griega
Santa Catarina
Eloy Cavazos
Lerdo de Tejada
Exposición

Line 1 is a line on the Metrorrey system. It has 19 stations and it runs 18.828 km (11.699 mi) from Talleres to Exposición. The line opened on April 25, 1991.

History

[edit | edit source]

Construction for Line 1 began on April 18, 1988 and it opened three years later on April 25, 1991, from Exposición to San Bernabé.[1] On June 11, 2002, a new station on the line was opened: Talleres, replacing San Bernabé station as the northern terminus of the line.

Chronology

[edit | edit source]

Station list

[edit | edit source]
No. Logo Station Date opened Level Transfer(s) Location
01 Talleres June 11, 2002 Surface Transmetro Routes: No Reelección, Cabezada - Alianza, Julio A. Roca Monterrey
02 San Bernabé April 25, 1991 Elevated
03 File:Unidadmodelostation mtymetro.png Unidad Modelo April 25, 1991 Elevated
04 Aztlán April 25, 1991 Elevated
05 Penitenciaría April 25, 1991 Elevated
06 Alfonso Reyes April 25, 1991 Elevated
07 File:Mitrasstation mtymetro.png Mitras April 25, 1991 Elevated Ecovía
08 Simón Bolívar April 25, 1991 Elevated
09 Hospital April 25, 1991 Elevated
10 Edison April 25, 1991 Elevated
11 Central April 25, 1991 Elevated
12 Cuauhtémoc April 25, 1991 Elevated File:Line2mtymetro.png Metro Line 2
13 Del Golfo April 25, 1991 Elevated
14 Felix U. Gómez April 25, 1991 Elevated Metro Line 3
15 Parque Fundidora April 25, 1991 Elevated Transmetro Route: Macroplaza - Fundidora
16 Y Griega April 25, 1991 Elevated Express Route: Aeropuerto - Y Griega [2]
17 Eloy Cavazos April 25, 1991 Elevated Guadalupe
18 Lerdo de Tejada April 25, 1991 Elevated
19 Exposición April 25, 1991 Elevated Transmetro Route: Exposición - México

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ "Conoce la nueva Ruta Express Aeropuerto - Y Griega", Gobierno de Nuevo Leon