| Status | Operational |
| Construction began | August 1965 |
| Commission date | 18 July 1968 (old Unit 1) 17 March 1972 (old Unit 2)[1] 6 October 2016 (Unit 1) 24 March 2017 (Unit 2) |
| Decommission date | 1 September 2014 (old Unit 1-2)[2] |
| Owner | Taipower |
| Operator | Taipower |
| Thermal power station | |
| Primary fuel | Coal |
| Power generation | |
| Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value). | |
| Nameplate capacity | 3 X 800 MW |
The Linkou Power Plant (traditional Chinese: 林口發電廠; simplified Chinese: 林口发电厂; pinyin: Línkǒu Fādiànchǎng) is a coal-fired power plant in Linkou District, New Taipei, Taiwan.[3] With the previous total installed capacity of 600 MW,[4] the power plant used to be the smallest coal-fired power plant in Taiwan. The power plant is currently undergoing retrofitting to increase its installed generation capacity to 2.4 GW.
Events
[edit | edit source]1968
[edit | edit source]The power plant began its operation on 18 July 1968 after a successful train run of its first 300 MW giant electric generator which started two weeks before.[5]
2014
[edit | edit source]On 1 September 2014, the current two unit generators were decommissioned.[2]
2016
[edit | edit source]On 6 October 2016, the plant completed its refurbishment of its old two units and commissioned the new one supercritical unit of 800 MW.[6][7][8]
2017
[edit | edit source]On 24 March 2017, the second of the 800 MW unit was commissioned.[8]
2019
[edit | edit source]One 800 MW ultra supercritical coal-fired unit has been built by Mitsubishi Heavy Industries and CTCI Corporation at the plant.[9][10][11] On 24 October 2019, the third unit was commissioned.[8]
Technical specifications
[edit | edit source]The power plant consists of three generating units with a total installed capacity of 2,400 MW. Each generating unit has an installed capacity of 800 MW.[12]
Transportation
[edit | edit source]Linkou Power Plant is accessible north of Shanbi Station of Taoyuan Metro.
See also
[edit | edit source]Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).