Line 5 (Ningbo Rail Transit)

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
Line 5
File:NBRT Line 5 icon.svg
File:Huizhan Zhongxin Station, 2022-02-13 05.jpg
Overview
StatusOperational
OwnerNingbo
LocaleNingbo, Zhejiang, China
Termini
Stations27
Service
TypeRapid transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Co., Ltd.
History
Opened28 December 2021; 4 years ago (2021-12-28)
Technical
Line length36.6 km (22.74 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map
File:Line 5, Ningbo Rail Transit.svg

Line 5 of Ningbo Rail Transit (Chinese: 宁波轨道交通5号线) is a rapid transit line in Ningbo. It starts from west Yinzhou District and ends in Luotuo Bridge Station in Zhenhai District. In the future extension plan, the line will extend and become a loop.[1]

The construction of the first section started on 28 September 2016.[2] The line uses GoA4 fully automated trains.[3][4] It is 27.9 km (17.3 mi) in length with 22 stations.[5] The line opened on 28 December 2021.[5]

Phase 2 of line 3 will have 5 more stations north of Datong Bridge, but due to restrictions of an old airport, part of the phase 2 between Datong Bridge and Yongmao Road is stalled for construction.[6] The rest 3 stations of phase 2 has started construction since 2 December 2019,[7] and will temporary run as a part of line 5. Test run of phase 2 of line 3 started in 1 February 2024.[8]

Route

[edit | edit source]

Phase 1 of Line 5 starts from Buzheng Station in western Yinzhou District as an underground line. Then it goes along Yinxian Road and passes the Fenghua River until it reaches Xiaying and turns north. Then the line goes along first Haiyan Road and then Yuanshi Road. Then the line passes the Yong River and reaches its destination, Xingzhuang Road Station.[9]

Opening timeline

[edit | edit source]
Segment Commencement Length Station(s) Name
Buzheng — Xingzhuang Road 28 December 2021 27.6 km (17.15 mi) 22 Phase 1
Xingzhuang Road — Meiyan 28 June 2024[10] 2 Part constructed together with Phase 2 of Line 3
Meiyan — Luotuo Bridge 28 June 2024[10] 3 Phase 2 of Line 3, now temporarily run as a part of Line 5

Stations

[edit | edit source]
Station name Connections Location
English Chinese
Buzheng 布政 Haishu
Zhangjiatan 张家潭
Tongde Road 同德路
Shiqi 石碶  2 
Yadu 雅渡
Miaoyan 庙堰  8  Yinzhou
Zhonggongmiao 钟公庙
Yinzhou Government 鄞州区政府  3 
Qianhu South Road 钱湖南路
South Higher Education Park 南高教园区  4 
Xiaying Road 下应路
Dayangjiang 大洋江
Sigang 泗港
Caoga 曹隘
Liuga 柳隘
Haiyan North Road 海晏北路  1 
Min'an East Road 民安东路  7 
International Convention and Exhibition Center 会展中心
Yuanshi Road 院士路  6 
Angmenggang 盎孟港
Sanguantang 三官堂  2  Jiangbei
Xingzhuang Road 兴庄路 Zhenhai
Xinghai South Road 兴海南路
Meiyan 梅堰  10  Jiangbei
↓ Phase 2 of Line 3, now temporarily run as a part of Line 5
Yongmao Road 永茂路 Zhenhai
Zhenhai Avenue (Cihai) 镇海大道(慈海)  7 
Luotuo Bridge 骆驼桥

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  7. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  8. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  9. ^ Ningbo Environment Protection Design Group, Environment impact report of Line 5, Ningbo Rail Transit, Ningbo, January, 2016
  10. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).