Laforge-2 generating station
Jump to navigation
Jump to search
| Laforge-2 generating station | |
|---|---|
| File:Centrale hydroélectrique Laforge-2.jpg | |
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| Official name | Centrale Laforge-2 |
| Location | Baie-James, Quebec, Canada |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Opening date | 1996 |
| Owner | Hydro-Québec |
| Dam and spillways | |
| Impounds | Laforge River |
| Spillway capacity | 2,350 m3/s (82,989 cu ft/s) |
| Reservoir | |
| Creates | Laforge-2 Reservoir |
| Surface area | 260 km2 (100 mi2) |
| Power Station | |
| Hydraulic head | 27.4 m (90 ft) |
| Turbines | 2 × 159.5 MW (Kaplan turbine) |
| Installed capacity | 319 MW |
| Hydro-Québec, The La Grande Complex visitor booklet, 2004, Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value). | |
Expression error: Unexpected < operator
The Laforge-2 is a hydroelectric generating station on the Laforge River, a tributary of the La Grande River, and is part of Hydro-Québec's James Bay Project. The station can generate 319 MW and was commissioned in 1996. It is considered a "run of the river" generating station since the Laforge-2 Reservoir is located much farther upstream. Together with La Grande-1, they are the only two generating stations of the James Bay Project that use a reservoir without any major water level fluctuations. Thus, the amount of electricity generated by the station depends almost entirely on the waterflow of the river, which is largely controlled by upstream reservoirs and generating stations.