July

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
<< July >>
Su Mo Tu We Th Fr Sa
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31  
2026

July is the seventh month of the year in the Julian and Gregorian calendars. Its length is 31 days. It was named by the Roman Senate in honour of Roman general and statesman Julius Caesar in 44 B.C., being the month of his birth. Before then it was called Quintilis, being the fifth month of the calendar that started with March.[1]

It is on average the warmest month in most of the Northern Hemisphere, where it is the second month of summer, and the coldest month in much of the Southern Hemisphere, where it is the second month of winter. The second half of the year commences in July. In the Southern Hemisphere, July is the seasonal equivalent of January in the Northern hemisphere.

"Dog days" are considered to begin in early July in the Northern Hemisphere, when the hot sultry weather of summer usually starts. Spring lambs born in late winter or early spring are usually sold before 1 July.

Symbols

[edit | edit source]
Error creating thumbnail:
Ruby gemstone

July's birthstone is the ruby, which symbolizes contentment.[citation needed]

Blue delphinium (Larkspur)
Blue delphinium (Larkspur)
White water lily
White water lily
File:07 July - Percent of global area at temperature records - Global warming - NOAA.svg
In recent decades, the number of warm temperature records in July has outpaced cold temperature records over a growing portion of Earth's surface.[2]

Its birth flowers are the larkspur and the water lily. The zodiac signs are Cancer (until July 22) and Leo (July 23 onward).[3][4]

Observances

[edit | edit source]

This list does not necessarily imply either official status nor general observance.

File:Breviarium Grimani - Juli.jpg
File:Les Très Riches Heures du duc de Berry juillet.jpg
July, from the Très Riches Heures du Duc de Berry
File:Fourth of July fireworks behind the Washington Monument, 1986.jpg
Fireworks in Washington, DC, to celebrate Independence Day on July 4

Month-long

[edit | edit source]

Non-Gregorian

[edit | edit source]

(All Baha'i, Islamic, and Jewish observances begin at the sundown before the date listed, and end at sundown of the date in question unless otherwise noted.)

Canada Day is celebrated on July 1
Canada Day is celebrated on July 1

Movable

[edit | edit source]

First Friday

[edit | edit source]

First Saturday

[edit | edit source]

First Saturday and Sunday

[edit | edit source]

First Sunday

[edit | edit source]

Sunday closest to 2 July

[edit | edit source]

First full week in July

[edit | edit source]

First Monday

[edit | edit source]

5 July or following Monday if it's a weekend

[edit | edit source]

Day after first Monday

[edit | edit source]

Second Monday

[edit | edit source]

Second Thursday

[edit | edit source]

Second Sunday

[edit | edit source]

Nearest Sunday to 11 July

[edit | edit source]

Third Monday

[edit | edit source]

Third Sunday

[edit | edit source]

Second to last Sunday in July and the following two weeks

[edit | edit source]

Third Tuesday

[edit | edit source]

Fourth Sunday

[edit | edit source]

Friday preceding the Fourth Saturday and the following Sunday

[edit | edit source]

Fourth Thursday

[edit | edit source]

Last Saturday

[edit | edit source]

Last Sunday

[edit | edit source]

Thursday before the first Monday

[edit | edit source]
Following Friday
[edit | edit source]

Last Friday

[edit | edit source]

Fixed Gregorian

[edit | edit source]

See also

[edit | edit source]

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value). Link is an example for one month; for other months, change the "202501" in the preceding URL to yyyymm, where yyyy is the four-digit year and mm is the two-digit month (01=January through 12=December)
  3. ^ The Earth passed the junction of the signs at 08:36 UT/GMT July 22, 2020, and will pass it again at 14:26 UT/GMT July 22, 2021.
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).. Signs in UT/GMT for 1950–2030.
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  7. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
[edit | edit source]

Lua error in Module:Sister_project_links at line 396: attempt to index field 'wikibase' (a nil value).

Lua error in Module:Authority_control at line 153: attempt to index field 'wikibase' (a nil value).