Jorethang Loop Hydroelectric project
| Jorethang Loop Hydroelectric project | |
|---|---|
| Lua error in Module:Location_map at line 411: Malformed coordinates value. | |
| Official name | Jorethang Loop Hydroelectric project |
| Location | Sikkim, India |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). |
| Opening date | 26 September 2015 |
| Construction cost | Rs. 1,182 crore |
| Owner | Government of India |
| Operator | Sikkim Renewable Energy Development Agency |
| Dam and spillways | |
| Type of dam | Concrete Gravity |
| Impounds | Rangit River |
| Height | 17 metres (56 ft) |
| Length | 108 metres (354 ft) |
| Spillway capacity | m³/s |
| Reservoir | |
| Surface area | 14.489 hectares (35.80 acres) |
| Power Station | |
| Commission date | 29 October 2015 |
| Type | Run-of-the-river |
| Turbines | 2×48 MW |
| Installed capacity | 96 MW |
| Annual generation | 444.03 GWh |
Expression error: Unexpected < operator
Jorethang Loop Hydroelectric project is a 96 megawatts (129,000 hp), run-of-the-river hydroelectric power station on the Rangit river in South Sikkim district of Sikkim state in India.[1] The dam is located near village Piple and the power station is located about 13 km downstream near village Majhitar. Dans Energy Private Limited was awarded contract for construction of the project. The project was officially inaugurated on 29 October 2015. The project was built at a cost of Rs 1,182 crores.[2][3][4]
Powerhouse
[edit | edit source]The dam is located about 5 km upstream from Jorethang and the powerhouse is located about 13 km downstream from dam site at Lua error: callParserFunction: function "#coordinates" was not found.. Water is diverted from the barrage through a 6.8 km−long head race tunnel, through a surge shaft of 25 m diameter and pressure shaft to the power house near the village of Majitar. The powerhouse has 2 x 48.75 MW vertical shaft type Francis turbines that generate 2x48 MW power. The water flow is discharged back into Rangit river through a 40m tall race channel. With installed capacity of 96 MW, the project is expected to generate approximately 444.03 GWh per annum.[1][5]
Power transmission
[edit | edit source]The electricity generated is connected to switchyard near the powerhouse and evacuated through double circuit 220 kV transmission line to the New Melli 220KV switching substation. New Melli sub station is located about 10 km away from the powerhouse and connected to Eastern Regional Grid.[1][6]
See also
[edit | edit source]Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
- Rangit Hydroelectric Power Project Stage III – situated upstream
References
[edit | edit source]- ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
External links
[edit | edit source]