CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
Opening date26 September 2015
Construction costRs. 1,182 crore
OwnerGovernment of India
OperatorSikkim Renewable Energy Development Agency
Dam and spillways
Type of damConcrete Gravity
ImpoundsRangit River
Height17 metres (56 ft)
Length108 metres (354 ft)
Spillway capacitym³/s
Reservoir
Surface area14.489 hectares (35.80 acres)
Power Station
Commission date29 October 2015
TypeRun-of-the-river
Turbines2×48 MW
Installed capacity96 MW
Annual generation444.03 GWh

Expression error: Unexpected < operator

Jorethang Loop Hydroelectric project is a 96 megawatts (129,000 hp), run-of-the-river hydroelectric power station on the Rangit river in South Sikkim district of Sikkim state in India.[1] The dam is located near village Piple and the power station is located about 13 km downstream near village Majhitar. Dans Energy Private Limited was awarded contract for construction of the project. The project was officially inaugurated on 29 October 2015. The project was built at a cost of Rs 1,182 crores.[2][3][4]

Powerhouse

[edit | edit source]

The dam is located about 5 km upstream from Jorethang and the powerhouse is located about 13 km downstream from dam site at Lua error: callParserFunction: function "#coordinates" was not found.. Water is diverted from the barrage through a 6.8 km−long head race tunnel, through a surge shaft of 25 m diameter and pressure shaft to the power house near the village of Majitar. The powerhouse has 2 x 48.75 MW vertical shaft type Francis turbines that generate 2x48 MW power. The water flow is discharged back into Rangit river through a 40m tall race channel. With installed capacity of 96 MW, the project is expected to generate approximately 444.03 GWh per annum.[1][5]

Power transmission

[edit | edit source]

The electricity generated is connected to switchyard near the powerhouse and evacuated through double circuit 220 kV transmission line to the New Melli 220KV switching substation. New Melli sub station is located about 10 km away from the powerhouse and connected to Eastern Regional Grid.[1][6]

See also

[edit | edit source]

Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').

References

[edit | edit source]
  1. ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
[edit | edit source]