Seohae Line

From Wikipedia, the free encyclopedia
(Redirected from Inju station)
Jump to navigation Jump to search

Seohae Line
File:South Korea subway logo.svg File:Seohae Line.svg
File:Seohae line 39111.jpg
Overview
Native name서해선
Seohaeseon
StatusOperational
OwnerKorea Rail Network Authority
Termini
Stations21
Service
Operator(s)Korail, SEO HAE RAIL CO.,LTD., ERAIL Co., Ltd.
Rolling stockKorail Class 391000
ITX-Maum
History
Opened16 June 2018
Technical
Line length47 km (29 mi) (131 km, future)
Number of tracks2
Track gauge1,435 mm (4 ft 8 1⁄2 in)
Electrification25 kV 60 Hz AC
Seohae Line
Hangul
서해선
Hanja
西海線
RRSeohaeseon
MRSŏhaesŏn

The Seohae Line (Korean서해선; lit. West Sea Line) is a dual-track, electrified rail line in western Gyeonggi-do and Seoul, South Korea. The Seohae Line is being built in four sections simultaneously. The line runs 47 km (29 mi) south from Ilsan in Goyang City, crosses the Han River, passes Gimpo Airport, Sosa, Siheung, and ends in Wonsi in Ansan. There is a transfer to different lines at Daegok, Neunggok, Gimpo Int'l Airport, Bucheon Stadium, Sosa and Choji.[1] There are currently 21 stations (Ilsan-Wonsi). The line is operated by Korail, but the stations between Sosa and Wonsi are managed by SEO HAE RAIL CO., LTD., a subsidiary of Seoul Metro.[2] Since the infrastructure is also owned by Korail, the line runs on the left like the rest of the South Korean mainline railway network.

History

[edit | edit source]

After the completion of planning, the project was written out as a build–lease–transfer (BLT) project, and Daewoo was selected[3] as preferred bidder in September 2008.[1] Construction was scheduled to last from October 2009 to March 2013.[4] Due to the 2008 financial crisis, it was difficult to gather investors to finance the project, and negotiations stalled.[1] An agreement was finally signed on 21 December 2010, with construction set to start in the first half of 2011.[1] Project costs are 1.5248 trillion; the contractor has altogether seven years for design and construction, and will manage and maintain the line for the first 20 years of operation.[1]

The first section began construction in 2011 and opened on 16 June 2018.[5] The second section runs north from Sosa to Daegok on the Gyeongui-Jungang Line and Seoul Subway Line 3, with transfers to several other lines. It was expected to open on 29 June 2021,[6] but did not open until 1 July 2023.[7][8] Another extension (Daegok-Ilsan) was opened at the end of August 2023.[9][10] As of October 2024, about ₩4.12 trillion (US$2.98 billion) has been spent on the Seohae Line.[11]

Future

[edit | edit source]

Another extension (Ilsan-Unjeong) was approved in January 2024.[12] There is currently no opening date noted.

On 1 September 2010, the South Korean government announced a strategic plan to reduce travel times from Seoul to 95% of the country to under 2 hours by 2020. As part of the plan, the first section is to be further upgraded for 230 km/h (140 mph) the Wonsi–Hwayang extension is to be projected for 250 km/h (160 mph), and the line may see KTX service.[13]

Tentative plans foresee the upgrade and incorporation of the Gyooe Line, a single-track non-electrified line without passenger service that connects Neunggok station (with a junction just before Daegok station) and Uijeongbu station in Uijeongbu. The Uijeongbu–Daegok–Sosa–Wonsi Line would then provide orbital metro service as a northern semicircle around Seoul, complementing the southern semicircle formed by the Suin–Bundang Line.

Another part of the tentative 2010 plans was a southern extension from Wonsi, connecting up with the Janghang Line before Hongseong station.[14][7] As of April 2023, the construction of this section was 92% completed and was expected to be opened in the second half of October 2024.[15] However, by late 2024, the opening date of the Wonsi–Seohwaseong extension had been delayed to the first half of 2026.[16][17]

Rolling stock

[edit | edit source]

Map of the Seohae Line and other surrounding lines

[edit | edit source]

<mapframe zoom="11" frameless="1" align="left" height="630" latitude="37.468222" longitude="126.797389" width="500">[ { "type": "ExternalData", "service": "geoline", "properties": { "stroke-width": 4 }, "query": "SELECT ?id (if(BOUND(?idhexcolor), concat('#', str(?idhexcolor)), if(BOUND(?hexcolor), concat('#', str(?hexcolor)), '#07c63e')) as ?stroke) (concat('Line length: ', str(?length), ' km') as ?description) (if(BOUND(?link), concat('', ?idLabel, ''), ?idLabel) as ?title) WHERE { VALUES ?sys { wd:Q16950 } { ?id p:P5817/ps:P5817 wd:Q55654238. ?id wdt:P16 */wdt:P361* ?sys. } MINUS { VALUES ?rem { wd:Q548662 wd:Q55697304 } ?id wdt:P31/wdt:P279* ?rem. } OPTIONAL { ?id wdt:P465 ?idhexcolor. } OPTIONAL { ?id wdt:P462 ?color. ?color wdt:P465 ?hexcolor.} SERVICE wikibase:label { bd:serviceParam wikibase:language 'en,mul' . ?id rdfs:label ?idLabel . } OPTIONAL {?link schema:about ?id. ?link schema:isPartOf <https://en.wikipedia.org/> . } } GROUP BY ?id ?link ?idLabel ?length ?hexcolor ?idhexcolor "}, { "type": "ExternalData", "service": "geopoint", "properties": { "marker-symbol": "rail-metro", "marker-size" : "small"}, "query": "SELECT DISTINCT ?id ?geo ?marker_color (if(BOUND(?image), concat('File:', substr(str(?image), 52, 400), ''), ?typeLabel) as ?description) (if(BOUND(?link), concat('', ?idLabel, ''), ?idLabel) as ?title) WHERE { VALUES ?sqid { wd:Q626243 } { ?id p:P5817/ps:P5817 wd:Q55654238; wdt:P81/wdt:P16*|wdt:P1192/wdt:P16* ?sqid; wdt:P625 ?geo. } MINUS { VALUES ?not { wd:Q6501349 } ?id wdt:P31/wdt:P279* ?not. } OPTIONAL { ?id wdt:P18 ?image. } OPTIONAL { ?sqid wdt:P465 ?idhexcolor. } OPTIONAL { ?sqid wdt:P462/wdt:P465 ?hexcolor. } BIND(COALESCE(?idhexcolor,?hexcolor,'5c72f2') as ?marker_color) SERVICE wikibase:label { bd:serviceParam wikibase:language 'en,mul' . ?id rdfs:label ?idLabel . } OPTIONAL {?link schema:about ?id. ?link schema:isPartOf <https://en.wikipedia.org/> . } }" }]</mapframe>

Stations

[edit | edit source]

Urban section

[edit | edit source]

The section from Sosa to Wonsi opened on 16 June 2018. The first phase (Sosa to Daegok) of the Sosa to Ilsan extension opened on 1 July 2023. The second phase (Daegok to Ilsan) of the Sosa to Ilsan extension opened on 26 August 2023. The line currently utilizes seven four-car Class 391000 trains manufactured by Hyundai Rotem and ten four-car Class 391000 trains manufactured by Dawonsys.

Station
number
Station name
English
Station name
Hangul
Station name
Hanja
Transfer Distance
in km
Total
distance
Location
S07 Ilsan 일산 Gyeongui–Jungang Line (Shared) --- 0.0 Gyeonggi-do Goyang-si
S08 Pungsan 풍산 1.9 1.9
S09 Baengma 백마 1.7 3.6
S10 Goksan 곡산 1.6 5.2
S11 Daegok 대곡 File:Seoul Metro Line 3.svg Gyeongui–Jungang Line 1.7 6.9
S12 Neunggok 능곡 Gyeongui–Jungang Line 1.8 8.5
S13 Gimpo Int'l Airport 김포공항 File:Seoul Metro Line 5.svg File:Seoul Metro Line 9.svg File:Seoul Metro Line Arex.svg Gimpo Goldline 7.4 15.9 Seoul Gangseo-gu
S14 Wonjong 원종 4.3 20.2 Gyeonggi-do Bucheon-si
S15 Bucheon Stadium 부천종합운동장 File:Seoul Metro Line 7.svg 2.1 22.3
S16 Sosa
(Seoul Theological Univ.)
Lua error: not enough memory. File:Seoul Metro Line 1.svg 2.7 25.0
S17 Sosaeul
(Bucheon Univ. Sosa Campus)
Lua error: Internal error: The interpreter exited with status 1. 소새울 1.7 26.7
S18 Siheung Daeya Lua error: Internal error: The interpreter exited with status 1. 2.1 28.8 Siheung-si
S19 Sincheon Lua error: Internal error: The interpreter exited with status 1. 1.4 30.2
S20 Sinhyeon Lua error: Internal error: The interpreter exited with status 1. 3.3 33.5
S22 Siheung City Hall Lua error: Internal error: The interpreter exited with status 1. 3.6 37.1
S23 Siheung Neunggok Lua error: Internal error: The interpreter exited with status 1. 1.3 38.4
S24 Dalmi Lua error: Internal error: The interpreter exited with status 1. 달미 2.4 40.8 Ansan-si
S25 Seonbu
(Hando Hospital)
Lua error: Internal error: The interpreter exited with status 1. 1.6 42.4
S26 Choji Lua error: Internal error: The interpreter exited with status 1. File:Seoul Metro Line 4.svg Suin–Bundang Line 1.7 44.1
S27 Siu Lua error: Internal error: The interpreter exited with status 1. 1.4 45.5
S28 Wonsi Lua error: Internal error: The interpreter exited with status 1. 1.5 47.0
S29 Int'l Theme Park (April 2027) 국제테마파크 國際테마파크 Hwaseong-si
S30 Seohwaseong (March 2026) 서화성 西華城

The line is being extended southward from Wonsi to Seohwaseongnamyang. Station names may be subject to change as the line is constructed and various sources give conflicting information.[18]

Conventional rail

[edit | edit source]

Opened on 2 November 2024.

Station name Transfer Distance in km Location
Romanized Hangul Hanja Station distance Total distance
Seohwaseong 서화성 西 --- 0.0 Gyeonggi-do Hwaseong-si
Hwaseong City Hall 화성시청 7.3 7.3
Hyangnam 향남 11.4 18.7
Anjung 안중 Pyeongtaek Line 19.1 37.8 Pyeongtaek-si
Inju 인주 17.5 55.3 Chungcheongnam-do Asan-si
Hapdeok 합덕 8.8 64.1 Dangjin-si
Hongseong 홍성 Janghang Line 24.6 88.7 Hongseong-gun

See also

[edit | edit source]

References

[edit | edit source]
  1. ^ a b c d e Lua error: Internal error: The interpreter exited with status 1.
  2. ^ Lua error: Internal error: The interpreter exited with status 1.
  3. ^ Lua error: Internal error: The interpreter exited with status 1.Lua error: Internal error: The interpreter exited with status 1.
  4. ^ Daewoo E&C Non-Consolidated Financial StatementsLua error: Internal error: The interpreter exited with status 1. 31 December 2008 and 2007
  5. ^ Lua error: Internal error: The interpreter exited with status 1.
  6. ^ Lua error: Internal error: The interpreter exited with status 1.
  7. ^ a b Lua error: Internal error: The interpreter exited with status 1.
  8. ^ Lua error: Internal error: The interpreter exited with status 1.
  9. ^ Lua error: Internal error: The interpreter exited with status 1.
  10. ^ Lua error: Internal error: The interpreter exited with status 1.
  11. ^ Lua error: Internal error: The interpreter exited with status 1.
  12. ^ Lua error: Internal error: The interpreter exited with status 1.
  13. ^ Lua error: Internal error: The interpreter exited with status 1.
  14. ^ Lua error: Internal error: The interpreter exited with status 1.
  15. ^ Lua error: Internal error: The interpreter exited with status 1.
  16. ^ Lua error: Internal error: The interpreter exited with status 1.
  17. ^ Lua error: Internal error: The interpreter exited with status 1.
  18. ^ Lua error: Internal error: The interpreter exited with status 1.

Lua error: Internal error: The interpreter exited with status 1.

[edit | edit source]

Lua error: Internal error: The interpreter exited with status 1.

Lua error: Internal error: The interpreter exited with status 1. Lua error: Internal error: The interpreter exited with status 1. Lua error: Internal error: The interpreter exited with status 1.