Coordinates: 63°51′17″N 148°57′02″W / 63.85472°N 148.95056°W / 63.85472; -148.95056

Healy Clean Coal Project

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Healy Clean Coal Project
File:Healy Power Plant (46811431215).jpg
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
CountryUnited States
LocationHealy, Alaska
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
StatusShutdown in 2000, sale to GVEA pending
Commission date1998
OwnerAlaska Industrial Development and Export Authority (AIDEA)
Thermal power station
Primary fuelUsibelli Sub-bituminous coal
Turbine technologyClean coal technology
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).
Nameplate capacity50 MW

Healy Clean Coal Project was a clean coal technology demonstration program consisting of a coal fired electrical power station located in Healy, Alaska in Denali Borough. The project was a demonstration of the TRW Clean Coal Combustion System and the Babcock & Wilcox/Joy Spray Dryer Absorber (SDA) System designed to reduce oxides of nitrogen (NOX) and sulfur dioxide (SO2) emissions while burning a variety of coal types, including waste coal. The plant still operates as Healy Unit 2 but without the emissions-reduction technology.

The project constructed a plant adjacent to Golden Valley Electric Association (GVEA) 25 MW coal plant Healy Unit 1. Construction occurred from 1995 to 1997 at a cost of around $300 million. The facility operated briefly following its construction as part of the demonstration program, but has been shut down since 2000.[1] The research project is considered "complete" by the Department of Energy. The plant was sold in 2012 to the GVEA to resume power production.[2] It restarted in 2015, only to close the next year after an explosion. It resumed commercial operation in November 2018.[3]

Healy Unit 2 will be shut down in 2024 and Unit 1 will receive an emissions control system.[4]

Costs

[edit | edit source]

According to Golden Valley Electric Association (GVEA) the facility cost around $300 million, with the United States Department of Energy contributing $120 million, the Alaska Legislature contributing $25 million, the Alaska Industrial Development and Export Authority (AIDEA) contributing $150 million and both GVEA & Usibelli Coal Mine contributing $10 million in addition to in-kind contributions.[2]

See also

[edit | edit source]

References

[edit | edit source]
  1. ^ Alaska's Wild Resource Web: Healy Coal Plant #2
  2. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
[edit | edit source]