Harima Expressway
This article needs additional citations for verification. (January 2019) |
| Harima Expressway | |
|---|---|
| E29 播磨自動車道 | |
| Lua error in Module:Infobox_road/map at line 19: attempt to index field 'wikibase' (a nil value). | |
| Route information | |
| Length | 24.2 km (15.0 mi) |
| Existed | 2003–present |
| Major junctions | |
| From | Harima Junction in Tatsuno, Hyōgo File:JP Expressway E2.svg San'yō Expressway |
| To | Yamazaki Junction in Shisō, Hyōgo File:JP Expressway E2A.svg Chūgoku Expressway |
| Location | |
| Country | Japan |
| Major cities | Tatsuno, Aioi, Shisō |
| Highway system | |
The Harima Expressway (播磨自動車道, Harima Jidōsha-dō) is a national expressway in Hyōgo Prefecture, Japan. It is owned and operated by West Nippon Expressway Company. It is signed as E29 under the Ministry of Land, Infrastructure, Transport and Tourism's "2016 Proposal for Realization of Expressway Numbering."[1]
Naming
[edit | edit source]The expressway is officially referred to as the Chūgoku-Ōdan Expressway Himeji Tottori Route. The Chūgoku-Ōdan Expressway Himeji Tottori Route is the official designation for the Sanyō Expressway between Sanyō Himeji-Nishi Interchange and Harima Junction, the Harima Expressway between Harima Junction and Yamazaki Junction, the Chūgoku Expressway between Yamazaki Junction and Sayo Junction, and the Tottori Expressway between Sayo Junction and Tottori Interchange (concurrent with the Chūgoku-Ōdan Expressway Himeji Tottori Route).
Route description
[edit | edit source]The route is a two-lane expressway for its entire length, with some overtaking areas. The speed limit is 70 km/h.
History
[edit | edit source]The first section of the expressway was opened in 2003. As of August 2019, that 12.8 kilometres (8.0 mi) long section between the Sanyō Expressway and Hyōgo Prefecture Route 726 is still the only part of it open to traffic.
Future
[edit | edit source]The Harima Expressway is planned to be completed between its current northern terminus at Hyōgo Prefecture Route 726 and the Chūgoku Expressway in 2021. Upon completion, the total length of the expressway will be 24.2 kilometres (15.0 mi).[2]
Junction list
[edit | edit source]The entire expressway is in Hyōgo Prefecture.
| Location | km | mi | Exit | Name | Destinations | Notes | |
|---|---|---|---|---|---|---|---|
| Tatsuno | 0.0 | 0.0 | 9–1 | Harima | File:JP Expressway E2.svg San'yō Expressway– Kobe, Akō, Okayama | Southern terminus | |
| 12.8 | 8.0 | 1 | Harima-Shingū | Hyōgo Pref. Route 726 (Harima-Shingū Interchange Route) | Current northern terminus | ||
| Shisō | – | Hokubō | File:JP Expressway E2A.svg Chūgoku Expressway | Future northern terminus;p scheduled to open to traffic in 2021. | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| |||||||
References
[edit | edit source]External links
[edit | edit source]- (in Japanese) West Nippon Expressway Company