Coordinates: 34°11′3″S 142°10′23″E / 34.18417°S 142.17306°E / -34.18417; 142.17306

George Chaffey Bridge

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

George Chaffey Bridge
File:ChaffeyBridgeMildura.jpg
George Chaffey Bridge from Mildura in 2007
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
CarriesSturt Highway
CrossesMurray River
BeginsBuronga, New South Wales
EndsMildura, Victoria
Named forGeorge Chaffey
OwnerTransport for NSW
Preceded byRobinvale Bridge
Followed byAbbotsford Bridge
Characteristics
MaterialConcrete
Total length331 metres (1,086 ft)
Width9.8 metres (32 ft)
No. of spans9
Piers in water5
History
Opened12 March 1985 (1985-03-12)
ReplacesMildura Bridge (1927–1985)
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

The George Chaffey Bridge is a road bridge in Australia that carries the Sturt Highway across the Murray River from Buronga to Mildura.

History

[edit | edit source]

Old Mildura Bridge

[edit | edit source]

The previous Mildura Bridge was opened on 22 October 1927.[1] The design allowed for it to carry both road and railway traffic, but railway tracks were never laid.[2] It was a lift-span bridge supported by concrete pylons, with two approach spans on each side. Two of the truss spans and the lift span are now in the Mildura Marina.[3]

Current bridge

[edit | edit source]

Named in honour of engineer George Chaffey, the current bridge was opened on 12 March 1985, by Federal, New South Wales and Victorian transport ministers Peter Morris, Laurie Brereton and Steve Crabb.[4][5] The project was funded under the Australian Bicentennial Road Development Programme, constructed at a cost of $14 million.[5][6]

The nine-span, 331 metres (1,086 ft) long and 9.8 metres (32 ft) wide, prestressed concrete bridge was designed and constructed by the Department of Main Roads. The Victorian approach is 500 metres (1,600 ft) long, with a six-span, high-strength reinforced concrete I-beam floodway bridge, 80.4 metres (264 ft) long. The New South Wales approach to the main bridge crossing is 1.3 kilometres (0.81 mi) long, and includes three floodway bridges.[7][5]

See also

[edit | edit source]
Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ New Murray River Crossing, Mildura Roads Victoria issue 5 March 1985 page 5
  5. ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  7. ^ Mildura Main Roads March 1984 page 18
[edit | edit source]
  • Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).[permanent dead link]