Fowler Ridge Wind Farm

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Fowler Ridge Wind Farm
Fowler Ridge Wind Farm
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
LocationFowler, Indiana, United States
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
StatusOperational
Commission date2008
OwnersBP (50%)
American Electric Power(50%)
Wind farm
TypeOnshore
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).
Nameplate capacity600 MW
Capacity factor27.8% (average 2010-2018)
Annual net output1,460 GW·h

The Fowler Ridge Wind Farm is a wind farm in Benton County, Indiana, near the city of Fowler, IN about 30 miles (48 km) northwest of Lafayette and 90 miles (140 km) northwest of Indianapolis.[1] Fowler Ridge was originally developed in 2005 and 2006 by Orion Energy, LLC (Oakland, CA) and Vision Energy, LLC (Cincinnati, OH) and later sold in 2007 to BP and Dominion Resources. The project was constructed beginning in 2008 in two phases and has a nameplate capacity of 600 MW.[2]

Fowler Ridge was the second utility-scale wind power plant in Indiana, after the 130.5 MW Goodland I Wind Farm (also in Benton County and was also developed by Orion Energy, LLC (Oakland, CA) and Vision Energy, LLC (Cincinnati, OH)). The Benton County Wind Farm came online in 2008.[1] Some of the wind turbines are visible from US 52, the main highway through the County. They are also visible along US 41 in the Boswell area. Other wind farms developed by Orion and Vision include the Camp Grove Wind Farm and the Benton County Wind Farm.

Phase one

[edit | edit source]

The first phase of the project is online[3] and consists of 222 wind turbines, 182 Vestas V82-1.65 MW turbines and 40 Clipper C-96 2.5 MW[3][4] turbines, with a nameplate capacity of 400 MW.[1][5][6]

Phase two

[edit | edit source]

Phase two consists of 133 GE 1.5 MW wind turbines with a total nameplate capacity of 200 MW. Construction began in early 2009 and phase two became operational in early 2010.[7]

Electricity production

[edit | edit source]
Fowler Ridge Wind Electricity Generation[8]
Year Total Annual MW·h
2008 5,464
2009 830,401
2010 1,499,812
2011 1,447,913
2012 1,441,180
2013 1,482,943
2014 1,531,573
2015 1,612,058
2016 1,480,131
2017 1,319,565
2018 1,328,554
Average
(years 2010–2018)
1,460,414

See also

[edit | edit source]
Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').

References

[edit | edit source]
  1. ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ Wind farms generating money for Indiana community[permanent dead link]
  7. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  8. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
[edit | edit source]

[url=https://www.nwitimes.com/news/local/business/bp-investing-100-million-in-upgrades-at-indiana-wind-farm/article_7dd82fe2-21c7-11ee-8d09-fb3d355bf008.html]

Map Archived 2022-01-20 at the Wayback Machine from Fish & Wildlife Service permit