Fengning Pumped Storage Power Station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
Fengning Pumped Storage Power Station
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
CountryChina
LocationFengning Manchu Autonomous County, Hebei Province
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
StatusOperational
Construction began2013
Opening date2019-2024
Construction costCNY 19.24 billion ($2.6 billion)[1]
Upper reservoir
CreatesFengning Upper
Total capacity45,000,000 m3 (36,000 acre⋅ft)[1]
Lower reservoir
CreatesFengning Lower
Total capacity71,560,000 m3 (58,010 acre⋅ft)[1]
Power Station
Hydraulic head425 m
Pump-generatorsFrancis pump turbines
Phase 1: 6 x 300 MW
Phase 2: 6 x 300 MW
Installed capacity3,600 MW
Storage capacity40 GWh[2]
Annual generation3.42 TWh

Expression error: Unexpected < operator

The Fengning Pumped Storage Power Station (Chinese: 丰宁抽水蓄能电站) is a pumped-storage hydroelectric power station about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator was commissioned in 2019, the last in 2021. Project cost was US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station. It was constructed in two 1,800 MW phases. Main construction was completed in late 2021,[3][4] and became the largest pumped-storage power station in the world with an installed capacity of 3,600 MW. The 12th and final turbine began commercial operations in August 2024.[5]

The lower reservoir holds up to 66,150,000 m3 (53,630 acre⋅ft) of water of which 41,480,000 m3 (33,630 acre⋅ft) can be used for power generation. The upper reservoir withholds up to 48,830,000 m3 (39,590 acre⋅ft) of water of which 40,610,000 m3 (32,920 acre⋅ft) can be used for power generation. Water from the upper reservoir is sent to the underground power station down near the lower reservoir.[6] The facility is designed to consume 8.71 TWh of electricity for pumping, and then generate 6.61 TWh, annually.[1]

See also

[edit | edit source]
Lua error in mw.title.lua at line 392: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').

References

[edit | edit source]
  1. ^ a b c d Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).