Coordinates: 53°29′14″N 2°14′49″W / 53.48710°N 2.24700°W / 53.48710; -2.24700

Embankment Exchange

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Embankment Exchange
File:Embankment Exchange Salford February 2025.jpg
Embankment Exchange in February 2025
Lua error in Module:Location_map at line 411: Malformed coordinates value.
Former namesThe Residence Irwell Tower
The Residence Greengate Tower
General information
StatusCompleted
TypeResidential high-rise
LocationGreengate, Salford,
Greater Manchester,
England
CoordinatesLua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value).
Construction started2017
Completed2025
Cost£85 million[1]
OwnerLegacie Developments
HeightNorth Tower: 107 m (349 ft)
South Tower: 50 m (163 ft)
Technical details
Floor countNorth Tower: 35
South Tower: 16
Design and construction
ArchitectJeffrey Bell Architects / Falconer Chester Hall[2]
Website
www.embankmentexchange.co.uk

Embankment Exchange is a residential development in the Greengate area of Salford, Greater Manchester, England. It comprises 300 apartments across two buildings connected by a central podium: the 107-metre (349 ft) North Tower and 50 m (163 ft) South Tower.[2] The buildings were designed by Jeffrey Bell Architects.[3]

As of November 2025, the North Tower is the fifth-tallest building in Salford and the 23rd-tallest in Greater Manchester.

History

[edit | edit source]

Planning

[edit | edit source]

The planning application was submitted to Salford City Council in August 2015,[4] and planning approval was granted in March 2016.[5]

Construction

[edit | edit source]

In 2017 Elliot Group commenced construction of the complex, then called The Residence,[2] but progress was delayed the following year when main contractor Forrest went into administration.[6] Work stalled again in 2020 pending the outcome of a wider fraud investigation,[6] before restarting in February 2022 following the acquisition of the site by Legacie Developments, which renamed the project Embankment Exchange.[7] Construction was initially expected to complete in 2023,[2] and in October 2024 it was announced that completion was due by the end of the year.[8] The buildings were completed in 2025.[2]

Facilities

[edit | edit source]

The development includes a spa, a gym, a residents' lounge and bar, work-from-home booths, and a 24-hour concierge.[9]

[edit | edit source]

See also

[edit | edit source]

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ a b c d e Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  7. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  8. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  9. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
[edit | edit source]