Connaught Bridge Power Station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
Connaught Bridge Power Station
File:Connaught Bridge Power Station.jpg
Connaught Bridge Power Station
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
Official nameKlang Power Station
CountryMalaysia
LocationKampong Jawa, Klang, Selangor
CoordinatesLua error in Module:Coordinates at line 611: attempt to index field 'wikibase' (a nil value).
StatusOperational
Commission date26 March 1953
OperatorsCentral Electricity Board (CEB) (Lembaga Letrik Pusat (LLP)) (1953-1965)
National Electricity Board (NEB) (Lembaga Letrik Negara (LLN)) (1965-1990)
Tenaga Nasional Berhad (TNB) (1990-present)
Thermal power station
Primary fuelGas
Secondary fuelDistillate Fuel
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).

Connaught Bridge Power Station is a combined cycle (2 gas turbines and 1 steam turbine) and open cycle (4 gas turbines) power station located near Kampong Java in Klang, Selangor, Malaysia. It is one of the oldest power station in the country.

It was opened on 26 March 1953 by the High Commissioner for the Federation of Malaya, Sir Gerald Templer.

Capacity

[edit | edit source]

The Station has an installed generation capacity of 895 MW, the third largest of seven sister TNB power plants in the country. The power is produced through a combined-cycle block producing 315 MW, and 4 x GT13E1 open cycle gas turbines of 130 MW each.

As part of the Generation Division of the Tenaga Nasional Group of Malaysia, it shares and operates in support of the parent group's targets and objectives.

Redevelopment

[edit | edit source]

The Connaught Bridge Power Station is going through a redevelopment project.[1]

The EPC contract was awarded to Sinohydro Corporation Ltd and Sinohydro Corporation (M) Sdn Bhd Consortium on 2 May 2013 with a contract period of 28 months. After the redevelopment, the plant with capacity of 384.7 MW will commence operation on 1 September 2015.

Access

[edit | edit source]

The power station is near Bukit Badak Komuter station.

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).