BritNed
| BritNed | |
|---|---|
| Lua error in Module:Mapframe at line 703: attempt to index field 'wikibase' (a nil value). Location of BritNed | |
| Location | |
| Country | United Kingdom, Netherlands |
| Coordinates | Lua error: callParserFunction: function "#coordinates" was not found. Lua error: callParserFunction: function "#coordinates" was not found. |
| General direction | north–south, west–south |
| From | Isle of Grain, Kent |
| Passes through | North Sea |
| To | Maasvlakte, Rotterdam |
| Ownership information | |
| Partners | National Grid plc (United Kingdom) TenneT (Netherlands) |
| Construction information | |
| Manufacturer of conductor/cable | ABB |
| Cable layer | Global Marine Systems |
| Manufacturer of substations | Siemens |
| Installer of substations | BAM Nuttall |
| Construction started | 2009 |
| Commissioned | 2011 |
| Technical information | |
| Type | submarine cable |
| Type of current | HVDC |
| Total length | 260 km (160 mi) |
| Power rating | 1,000 MW |
| DC voltage | 450 kV |
| No. of poles | 2 |
BritNed is a 1,000 MW high-voltage direct-current (HVDC) submarine power cable between the Isle of Grain in Kent, the United Kingdom; and Maasvlakte in Rotterdam, the Netherlands.
The BritNed interconnector would serve as a link for the foreseeable European super grid project.
History
[edit | edit source]The project was announced in May 2007.[1] The installation of the first section of cable link started on 11 September 2009,[2] The entire 260 km (160 miles) cable was completed in October 2010.[3] It began operation on 1 April 2011,[4][5] and as of January 2012, electricity flow has mostly been from the Netherlands to the UK.[6]
Technical description
[edit | edit source]The 260 km (160-mile) long bi-pole 450 kV interconnector consists of two HVDC cables, which are bundled together. The capacity of the cable is 1,000 MW. The interconnector has two converter stations for connecting the link with the British and Dutch high-voltage electricity transmission systems.[7] The cable was produced by ABB and laid by Global Marine Systems, while the BAM Nuttall/Siemens consortium was responsible for the construction and equipping of the converter stations.[7][8] BritNed was completed on time and within the budget of €600 million.[5]
Operators
[edit | edit source]The respective transmission system operators of the United Kingdom and the Netherlands - National Grid plc and TenneT; formed a joint venture to fund and operate the interconnection, independently from National Grid and TenneT's regulated businesses.[9]
Outages
[edit | edit source]BritNed suffered a number of outages due to undersea cable faults in 2020/21. A significant outage happened on 9 March 2021 and the connection was scheduled to be restored on 8 May 2021, but this was later delayed until 7 June 2021.[10]
Coordinates
[edit | edit source]| Site | Coordinates |
|---|---|
| Grain Static Inverter Plant | Lua error: callParserFunction: function "#coordinates" was not found. |
| Maasvlakte Static Inverter Plant | Lua error: callParserFunction: function "#coordinates" was not found. |
See also
[edit | edit source]- NorNed
- Gridlink Interconnector
- HVDC Cross-Channel, 2,000 MW between UK and France
- Icelink, a proposed link between Iceland and Great Britain
- Nemo Link, 1,000 MW between UK and Belgium
- HVDC Norway–UK, 1,400 MW between UK and Norway
- List of HVDC projects in Europe
- Renewable energy in the United Kingdom
- Renewable energy in the Netherlands
References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).[permanent dead link]
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Justin Wilkes et al. The European offshore wind industry key 2011 trends and statistics p22 European Wind Energy Association, January 2012. Accessed: 26 March 2012.
- ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
External links
[edit | edit source]- Electrical interconnectors to and from Great Britain
- Electrical interconnectors to and from the Synchronous Grid of Continental Europe
- Electric power infrastructure in England
- Electric power infrastructure in the Netherlands
- Energy infrastructure completed in 2011
- HVDC transmission lines
- National Grid (Great Britain)
- Electrical interconnectors in the North Sea
- Netherlands–United Kingdom relations
- 2011 establishments in England
- 2011 establishments in the Netherlands