Bheri Babai Diversion Multipurpose Project

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
Bheri Babai Diversion Multipurpose Project
Lua error in Module:Location_map at line 415: attempt to index field 'wikibase' (a nil value).
CountryNepal
LocationSurkhet district
PurposePower, Irrigation
StatusUnder construction
Construction began2015
Opening date2023
OwnersMinistry of Energy, Water Resource and Energy
Dam and spillways
Type of damBarrage type
ImpoundsBheri River
Height13 m (43 ft)
Length6 x 15.30 m
Power Station
Commission date2023
TypeRoR
Hydraulic head121.5 m (399 ft)
Turbines3 Nos Francis-type
Installed capacity46.73 MW

Expression error: Unexpected < operator

Bheri Babai Diversion Multipurpose Project (SUB2Axis64) is a multi-basin irrigation as well as hydropower project lying in Surkhet District of Karnali Province in Mid-West Nepal. The water is diverted from the Bheri River and discharged to Babai River. The project aims to irrigate 51,000 ha of land in Banke and Bardiya District throughout the year. The elevation difference between the intake and irrigation area provided an opportunity to install 46.8 MW firm electricity. The project has a tunnel 12208 meters long that was constructed using a tunnel boring machine (TBM) for the first time in Nepal. The project is owned by the Ministry of Energy, Water Resources and Irrigation. Construction of the project commenced in 2015 and was expected to be complete in 2023. The project is estimated to cost NPR 30,00,00,00,000.[1]

As of June 2021, 45% of the construction work was completed.

Project description

[edit | edit source]

The headworks of the project is located in Chhote village of Lekhpharsa VDC on the right bank and Gothiyari village of Ramghat VDC on the left bank of the Bheri River. A diversion barrage across the Bheri will divert the flow to six intake orifices on the left bank of river. The flow is then conveyed to a three-bayed settling basin followed by a 12 km long headrace tunnel and 773 m long penstock pipe. A power station will be located on the right bank of the Babai River. The gross head of the project is 151 m while the design discharge is 40 m3/s.[1]

Contractors

[edit | edit source]
  • Tunnel: China Overseas Engineering Group Company (COVEC) and Robbins provided the TBM. The component was constructed ahead of schedule.[2]
  • Headworks and Powerhouse: Guangdong Yuantian Raman JV[3]
  • Electro-Mechanical works: Zhejiang Orient Engineering Co., Ltd.
  • Hydro-Mechanical works: Zhejiang Orient Engineering Co., Ltd.

See also

[edit | edit source]
[edit | edit source]

References

[edit | edit source]
  1. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).