Beaches Link

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Beaches Link

Lua error in Module:Mapframe at line 771: attempt to index field 'wikibase' (a nil value).
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
General information
TypeMotorway  (Proposed)
Length9.2 km (5.7 mi)
Route number(s)File:AUS Alphanumeric Route M8.svg
Major junctions
North end
 
South end
Location(s)
Major suburbs / townsBalgowlah, Seaforth, Northbridge, Willoughby, Naremburn
Highway system

The Beaches Link was a proposed underground motorway scheme in Sydney, New South Wales, Australia. It was proposed to consist of a series of motorway tunnels running north-south between Burnt Bridge Creek Deviation at Balgowlah and the Warringah Freeway at Cammeray, providing direct access from the Northern Beaches to the Sydney central business district.

The Beaches Link would consist of two branches, the main branch starting from Burnt Bridge Creek Deviation at Balgowlah and the second branch starting from Wakehurst Parkway at Seaforth. Both branches would have joined at Seaforth, and the tunnel crossed Middle Harbour to Northbridge to the west of the current main crossing, the Spit Bridge. From Northbridge, it would have connected with Gore Hill Freeway and Warringah Freeway at its southern end.[1]

A new connection road would be built at Balgowlah linking between Burnt Bridge Creek Deviation, the Beaches Link tunnel entrance and exit, and Sydney Road. The road would divide the former Balgowlah Golf Club grounds.[1] The Beaches Link would follow abandoned extensions of the Warringah Freeway in the 1960s and 1970s and bypasses the heavily congested Spit Bridge.

The project was first announced in December 2020 by the Berejiklian government as a single project with the Western Harbour Tunnel.[2] In June 2022, the Perrottet government announced that the project would be shelved indefinitely, due to budgetary constraints and labour shortages.[3] Following a change of government, the project was cancelled by the Minns government in September 2023.[4] However, Transport for NSW will retain ownership of acquired properties and the construction of stub tunnels at the Western Harbour Tunnel portals in Cammeray reserve a future connection to Beaches Link, should it be built by a future government.[5]

References

[edit | edit source]
  1. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Tunnel open by 2028 Northern Beaches Advocate 10 December 2020
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
[edit | edit source]