Bali–Java Powerline
| Bali–Java Powerline | |
|---|---|
| Location | |
| Country | Indonesia |
| Province | Bali East Java |
| Coordinates | Lua error in Module:Coordinates at line 489: attempt to index field 'wikibase' (a nil value). (Bali tower) |
| Ownership information | |
| Owner | PT PLN |
| Technical information | |
| Type | Overhead line |
| Total length | 219.16 km (136.18 mi) |
| No. of transmission towers | 512 |
| Power rating | 1,600 MW |
| AC voltage | 500 kV |
The Bali–Java Powerline is a planned electric power transmission line in Indonesia. It will be used for the crossing of the Bali Strait between Java and Bali. If built, the towers will be the world's tallest electricity pylons with a height of 376 metres (1,234 ft).[1] As of January 2018, the project is underway with planning for land acquisition.[2] However, as of April 2018, there are also indications that the project may never come to fruition as there is substantial resistance to the project for religious and cultural reasons.[3]
The line on the Java side will begin in at the Paiton power plant, then through Watu Dodol in Banyuwangi Regency, and on to Bali.[4] On the Bali side, it would be in parts of western Buleleng, Jembrana, Tabanan and Badung regencies.[5]
The two towers that will carry the line over the Bali Strait (Selatbali) have planned positions as follows: Lua error: callParserFunction: function "#coordinates" was not found. for the 363-metre tower (1,191 ft) on Java and Lua error: callParserFunction: function "#coordinates" was not found. for the 376-metre tower (1,234 ft) on the Bali side.[6]
References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).[permanent dead link]
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ For reports about the project, see Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value). The portion of the powerline crossing the Bali Strait is "Component 3".