Balakot Hydropower Project
| Balakot Hydropower Project | |
|---|---|
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| Country | Pakistan |
| Location | Kunhar River, Khyber Pakhtunkhwa |
| Coordinates | Lua error in Module:Coordinates at line 611: attempt to index field 'wikibase' (a nil value). |
| Status | under construction |
| Construction began | September 2022[1] |
| Construction cost | USD 550 million |
| Owner | Government of Khyber Pakhtunkhwa[2] |
| Operators | Pakhtunkhwa Energy Development Organisation, Government of Khyber Pakhtunkhwa |
| Power generation | |
| Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value). | |
| Nameplate capacity | 300 MW |
| Annual net output | 1,143 GWh |
The Balakot Hydropower Project is designed as a run-of-river scheme and is slated to be built on the Kunhar River.[3] Its primary objective is to generate clean energy and alleviate the demand-supply disparity in Khyber Pakhtunkhwa and nearby areas.[4] The project is anticipated to yield a power generation capacity of 300 MW, contributing to a significant average annual energy production of 1143 GWh.[3][5]
The Balakot Hydropower Project is a joint venture financially supported by both the Asian Development Bank and the Asian Infrastructure Investment Bank. The overall funding for this venture amounts to US$550 million, with the Asian Development Bank providing US$300 million, and the Asian Infrastructure Investment Bank contributing US$250 million.[3][6][7]
Construction
[edit | edit source]The Balakot Hydropower Project encompasses various key components, foremost being the construction of a 58-meter-high gravity concrete dam along with associated appurtenant structures. The project also involves river diversion works, a sediment bypass tunnel, and a comprehensive power circuit. The power circuit infrastructure comprises a power intake, a concrete-lined headrace tunnel, an upstream surge shaft, steel-lined pressure shafts and penstocks, a downstream surge shaft, and a concrete-lined tailrace tunnel. Additionally, the project includes a cavern-type powerhouse that accommodates three Francis turbines, collectively offering an installed capacity of 300 MW. This powerhouse is equipped with access tunnels and an exterior switchyard for efficient functioning.[8][9][10]
References
[edit | edit source]- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ a b c Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ https://www.adb.org/sites/default/files/linked-documents/49055-007-ea.pdf [bare URL PDF]
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
- ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).