Template:Certification Table Entry/Sales/BelgianPeriod/doc

From Wikipedia, the free encyclopedia
This is the current revision of this page, as edited by imported>Tom.Reding at 18:23, 26 December 2023 ({{High-use}}). The present address (URL) is a permanent link to this version.
(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

This helper template calculates periods for Belgian certifications, as detailed here. The sources used are:

  • Album change in May 2007[1]
  • Latest certain date for singles "old" levels October 2007[2]
  • First certain date for singles "new" levels June 2009[3],
  • 2016 singles change, July 2017 albums change[4]
  • July 2018 singles change [5]

References

  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).

It returns:

Before May 2007 Before October 2007 Before June 2009 Before 2016 Before July 2017 Before July 2018 From July 2018
1 2 3 4 5 6 7

Returns 0 if the data provided is insufficient