Sydney–Perth rail corridor

From Wikipedia, the free encyclopedia
(Redirected from Sydney-Perth rail corridor)
Jump to navigation Jump to search

File:Map of Australia's east-west rail corridor.png
The 4352 kilometres (2704 mi) east–west rail corridor, before and after the gauge standardisation of 1970. It includes the 1691 kilometres (1051 mi) historically significant Trans-Australian Railway in the middle. (click to enlarge)
File:NR22 NR52 DL49 1PM5 Kewdale 190306.jpg
Leaving Kewdale Freight Terminal, Western Australia, is a typical freight train of the East–west rail corridor, with three locomotives totalling 9340 hp (10,490 kW) power output, a crew car, and a train of up to 1.8  km of container cars (many of them double-stacked)

The Sydney–Perth rail corridor, also known as the East–west rail corridor, is a 1435 mm (4 ft 8+12 in) standard gauge railway route that runs for 4352 kilometres (2704 mi) across Australia from Sydney, New South Wales, to Perth, Western Australia.[1] Most of the route is under the control of the Australian Rail Track Corporation.[2]

The corridor is heavily trafficked by long-distance freight trains. As of 2008,[needs update] the rail corridor carried 81 per cent of land freight between the eastern states and Perth, up from 60 per cent in 1996–97;[3] and in November 2007, 3.46 billion gross tonne-kilometres of freight was carried, a record at the time.[4] [5]

As of 2022, major freight operators on the corridor included Pacific National, Aurizon, and SCT Logistics.

The Indian Pacific, an experiential tourism passenger train, operates along the entire route, with the journey typically taking three days.[6] Its sister train, The Ghan, travels over part of the corridor – from Adelaide to Tarcoola – before it proceeds north to Darwin.[7] Some local passenger services operate at each end (in Western Australia and New South Wales) but not in the central part, in South Australia.

Until the route was converted to standard gauge in 1970, differing choices of track gauges by three state governments required passengers and freight to be trans-shipped at Broken Hill, Port Pirie, and Kalgoorlie. These stations were on the following lines (from east to west):

References

[edit | edit source]
  1. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  2. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  3. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  4. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  5. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  6. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  7. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  8. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  9. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  10. ^ a b Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  11. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).
  12. ^ Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).

Bibliography

[edit | edit source]
  • Lua error in Module:Citation/CS1/Configuration at line 2172: attempt to index field '?' (a nil value).